- 20 -
5) Complete pipe brazing, check solenoid valve and expansion valve restrictions
and perform leak testing.
6) Hook up the drain line and check if water drains.
6. Connecting Electrical Wires
Connect all electrical components using the wiring diagrams in accordance with
all state and local codes.
7. Evacuating, Charging and Starting the System
1-Manifold High or Low Pressure Hose; 2-Receiver Discharge or
Compressor Suction Port; 3-Liquid or Suction Line; 4-Pressure Control;
BACK POSITION FRONT POSITION MIDDLE POSITION
Fig. 9 ROTALOCK Valve Operation
BACK POSITION FRONT POSITION MIDDLE POSITION
Fig. 10 Base Valve Operation
Back Position
: Normal operation, manifold port is closed.
Front Position
: Storage operation, liquid or suction line connection is closed.
Middle Position
: Installation operation, all ports are open.
Summary of Contents for WINE-MATE WM-12000SSA
Page 2: ...1 Important Safety Information...
Page 17: ...16 Fig 3 Temperature Controller 4 5 L X 4 5 W X 3 75H Fig 4 WM 25 120SFCA Evaporator Unit...
Page 18: ...17 Fig 5 WM 250 450SCUR Condensing Unit Fig 6 WM 650 1203SCUR Condensing Unit...
Page 29: ...28 Fig 19 WM 6500 12000SSA LA Electrical Wiring Diagram...