Installation
EN-UK
P.23
Installing the ground screw:
1
Ground screw
2
Prior to installation
3
After installation
4
Plastic expansion plug
3. Drill a hole of
Ø
10x55 mm with the electric drill seperatly at the marking position of the ground
screw.
Using an impact drill.
4. Fix a plastic expansion plug (
Ø
10x50 mm) and a ground screw (M8x36/ST7.5x46mm) with the ad-
justable spanner.
Preparation before fixing the toilet and floor flange:
1
Plastic sheath
2
Floor flange
3
Cap of screw
4
Screw of the floor flange
5. Remove the screws from floor flange on both sides and the floor flange from the toilet.