background image

Congratulations

 

on your purchase of our instant shelter. This unit is a combination 

of excellent manufacturing and design. It is comprised of a rigid frame and a durable 
cover.  For  easy  assembly,we  have  marked  all  the  parts  with  codes.  With  proper 
installation,use  and  maintenance,your  unit  will  provide  mang  years  of  good  and 
suitable service. 

 

READ ALL THE INSTRUCTIONS BEFORE ASSEMBLY ! 

 

1.The proper erection and installation of this building requires a high level of care and 
safety. We recommend the safety regulations be complied with during the installation. 
It includes but is not limited to: 
        - Safety hats, protective eyewear and protective clothing 
        - Safety harnesses for all elevated workers 
        - Proper ladder, cage, and safety operation 
2.  Site  selection:  Choose  a  solid  level  location  for  your  building.  Do  not  install  the 
building  where  the  ground  could  not  keep  the  building  steady.  Do  not  install  the 
building where the ground could not bear the weight of the building. Do not install the 
building in soft grass ground or wetland. 
3.  Be  cautions  with  the  surroundings.  Keep  work  area  clean.  Do  not  set  up  it  near 
snow  drifts,  n  slippery  places,  or  in  wet  location,  The  cover  of  the  building  will 
protect  against  normal  falling  leaves  and  light  debris,  however,  large,  fast  or  sharp 
falling  items  etc.  may  cause  a  puncture  or  tear  in  the  cover  material.  So  keep  the 
building away from such harmful things. Be careful with power and heat sources. Do 
not keep heat sources near the tarpaulin. Do not expose to open flame. 
4.  Chose  a  windless  day  to  install  the  building.  It  is  very  difficult  to  attach  the  in 
heavy wind. 
5. All snow accumulation on the main cover should be removed as soon as possible. 
Otherwise, when old snow on the roof becomes hard with new snow falling in,it will 
increase the burden of the roof badly and will damage the roof. 
6. Try to keep the building, especially  its base,  in a dry condition. This will  help the 
building to have a longer life than keeping it in a wet conditions. 
7. The user should be responsible for the parts missing or damage occurred during the 
installation. 
8. Do not make alteration of the frame. Do not hang anything besides  included parts 
to  the  frame.  Damages,  consequential  damages,  or  injuries  caused  by  improper 
installation, alteration, improper use, or damages caused by snow, wind, or any acts of 
nature  are  owing  to  the  user.  The  building  is  not  intended  for  occupancy  for  any 
length of time

 

 

 

 

 

Summary of Contents for JIT-2326J

Page 1: ...SHELTER MODEL JIT 2326J L8 0xW7 0xH4 8m Assembly Manual www vikre no ...

Page 2: ... snow drifts n slippery places or in wet location The cover of the building will protect against normal falling leaves and light debris however large fast or sharp falling items etc may cause a puncture or tear in the cover material So keep the building away from such harmful things Be careful with power and heat sources Do not keep heat sources near the tarpaulin Do not expose to open flame 4 Cho...

Page 3: ...ame and the tensioning equipments be well fixed When taking off the cover make sure the related ropes etc Be taken off and the cover will not be blocked during the way Avoid taking off the cover with heavy big power equipments 4 For the building with mechanical door Keep the door closed if it is not used for long time This helps the mechanical door to have a longer life 5 To enlongate the life of ...

Page 4: ...plate at front panel 2 9 Base plate at back panel 2 10 Door beam 2 11 Upper door track 2 12 Lower door track 1 12A Lower door track to connect the lower beam 1 13 Upper beam of front panel 2 13A Lower beam of front panel 1 14 Upper leg of back panel 2 15 Lower leg of back panel 2 16 Middle beam for back panel 1 17 Side beam for back panel 2 18 Tube clip for slanting support tube and support beam 1...

Page 5: ...ide cover beside the door 2 34 Band for tie down ratchet 10 35 Rope for fastening the two ends of roof cover the front door back cover 11 36 Plastic cap for tensioning tube 6 4 37 Door dropping tube in the middle 6sets 38 Door dropping tube at the bottom 1set 39 Felts to stick on the connection for protecting the cover 20 ...

Page 6: ...1 2B 3B 2 3 4 5 6L 6R 7R 7L 8 9 10 11 12 12A 13 13A 14 15 16 17 20 21 3B 25 2B 4 26 Figure 1 Sketch of JIT 2326J 2A 28 11 2A 3A 3C 5A ...

Page 7: ...ove all the components from packaging to ensure all components are present by checking with the Part List 6L 6R 2 0m 2 0m 2 0m 2 29m 3 7m Diagonals are equal 8 0m 2 0m FRONT 7m 1 65m 1 65m Locate the Left Corner Base Flange and Right Corner Base Flange part 6L 6R Secure the base flanges with Stake Pegs Part 23 Measurements shown in Figure 2 are to the center of the upright sockets on each Base Fla...

Page 8: ...anel frame According to Figure 5 6 connect the end wall frame by Using the bolts with washers and nuts through predrilled holes in frame members Do not tighten down the nuts completely until frame is fully assembled and set in place Figure 6 Frame Installation for Back Panel NOTE Please notice that the part code of the arch sections The sections of different arches are not the same Check with the ...

Page 9: ...bly continues Next stand first interior arch up to repeat insertion into Base flanges Immediately after putting first interior arch into place connect Front Arch and Interior arch using Roof Purlin Tubes at top ridge and side shoulder cures of arches Secure the Roof Purlin tubes into place using carriage bolts and nuts Next install the Slanting support tube part 5 and Tube Clip part 18 that connec...

Page 10: ...ver unpack cover and lay parallel to building frame on one side Cover must be pulled over top of frame assembly without being snagged or stressed on any frame members Use multiple ropes over top of frame as shown in picture below Having another person inside frame on a ladder to assist in getting Roof Cover over frame will insure the cover will go on without any damage E My Pictures pic 1850 兰村 复件...

Page 11: ...side the unit at both front and rear arches Using the rope provided lace the main cover grommet flap around the main frame front and rear arch pieces Start in the top middle of each arch and lace to each side Add rope length by tying pieces together or cutting as necessary Lace all grommets on cover inside flap with rope Starting at the middle top point over the door tighten lacing only enough to ...

Page 12: ...Figure 11 Fastening the two ends of the Roof Cover Figure 12 Installation of the Front Cover Figure 13 Installation of the Back Cover 33 32 31 35 ...

Page 13: ...ocket on one side The rope ties off to the loop that is located on the Base Flange in Corner part 6 Moving to the other side begin to pull the rope down Hold the rope in hand and push down at the bottom of the rope with a foot Pull the rope tight and tie off to the welded hoop on the Base Flange As you are pulling the edge rope it will be necessary to adjust the excess material that will collect a...

Page 14: ...xt install the steel wire that leads from the bottom of the door dropping tubes to the door winching assembly Take one of the Steel Wires in the Door kit and feed down from the top of the Door track to the Bottom Door Tube Dropping Tube 38 on the right hand side of the door facing from the inside When the steel wire goes down though the hole in the Bottom Dropping Tube tie a knot in the steel wire...

Reviews: