background image

2

11" dia.

hole

29½"

11" dia.

hole

1¼"

dia. hole

12

7

/

8

"

10¾"

25"

7¼"

7¼"

1¼"

dia. hole

9

1

/

8

"

9

1

/

8

"

W

a

ll

 S

tu

d

10¾"

24¾"

28¼"

W

a

ll Stud

12

7

/

8

"

W

a

ll

 S

tu

d

W

a

ll Stud

REMOVE

SIDING

REMOVE

SIDING

8½"

8½"

Pilot

Pilot
Hole

Hole

Pilot
Hole

OUTSIDE - WALL VIEW

OUTSIDE - WALL VIEW

1. Locate the blower on the rear slope of the roof.

Place it in a location to minimize duct run. The
location should be free of obstacles (T.V. leads,
electrical lines, etc.). Bear in mind, if the blower top
is level with the roof peak, it will not be seen from
the street. Keep this approximate location in mind
as you work from within the attic.

1. Choose a position on the outside wall. Make sure

that no wall studs, pipes or wires run through the
opening area.

PREPARE THE INSTALLATION
LOCATION

ROOF INSTALLATIONS

PREPARE THE INSTALLATION
LOCATION

WALL INSTALLATIONS

ALL INSTALLATIONS

5. For flat roof installations, build a curb that will mount

the blower at a minimum pitch of 2/12. See Figure
2. Discharge end of the blower should be pointed
away from prevailing winds.

20½"

11" 

dia.

hole

20½"

10

3

/

8

"

1¼" 

dia. hole

10

3

/

8

"

8½"

8½"

20¾"

20¾"

7¼"

7¼"

1¼" 

dia. hole

9

1

/

8

"

9

1

/

8

"

REMOVE 

SHINGLES

Roof   Rafter

REMOVE 

SHINGLES

11" 

dia.

hole

Roof   Rafter

Pilot

Pilot
Hole

Hole

Pilot
Hole

OUTSIDE - ROOF VIEW

OUTSIDE - ROOF VIEW

From inside the attic space:
2.

Drill a 

PILOT HOLE

 up through the roof, 8½"

from the 

inside edge

 of a 

ROOF RAFTER

.

From outside - on the roof:
3.

Measure and mark the 20¾" x 20½" rectangle.
Cut and remove only the shingles inside this
rectangle.

4.

Measure and mark the 

11" DIAMETER HOLE

and the

 1¼" DIAMETER HOLE

. Cut these holes

all the way through the roof.

Figure 1

6¾"

2"

28¼"

24¾"

2"

Figure 2

PREPARE THE BLOWER

1. Unpack the blower assembly.

2. Remove the cover and screws.

3. Remove and discard cardboard from blower wheel.

4. Remove the wiring box cover and screws.

5. Attach an appropriate U.L. approved cable con-

nector in the hole at the rear of the wiring box.

From inside the wall:
2.

Drill a 

PILOT HOLE

 through the wall, 8½" from

the 

inside edge

 of a 

WALL STUD

.

From outside - on the wall:
3.

Measure and mark the 25" x 29½" rectangle. Cut
and remove only the siding inside this rectangle.

4.

Measure and mark the 

11" DIAMETER HOLE

and  the 

1¼" DIAMETER HOLE

. Cut these holes

all the way through the wall.

Figure 3

Summary of Contents for VEV900

Page 1: ...bytheNationalFireProtectionAssociation NFPA and the American Society for Heating Refrigera tion and Air Conditioning Engineers ASHRAE and the local code authorities WARNING CAUTION 1 For general ventilating use only Do not use to exhaust hazardous or explosive material and va pors 2 To avoid motor bearing damage and noisy and or unbalanced impellers keep drywall spray con struction dust etc off po...

Page 2: ...s 20 11 dia hole 20 103 8 1 dia hole 103 8 8 8 20 20 7 7 1 dia hole 91 8 91 8 REMOVE SHINGLES Roof Rafter REMOVE SHINGLES 11 dia hole Roof Rafter Pilot Pilot Hole Hole Pilot Hole OUTSIDE ROOF VIEW OUTSIDE ROOF VIEW From inside the attic space 2 Drill a PILOT HOLE up through the roof 8 from the inside edge of a ROOF RAFTER From outside on the roof 3 Measure and mark the 20 x 20 rectangle Cut and re...

Page 3: ...ore installing housing cover and screws 120 VAC LINE IN BLACK TO BLACK WHITE TO WHITE GREEN TO GREEN 1 Place a large bead of caulk on the back side of the housing along the outer edge 2 Center the blower ring in the 11 diameter hole making sure that the 1 1 4 diameter electrical wiring hole aligns with the hole in the wiring box 3 Attach blower to the wall with the six screws provided All six hole...

Page 4: ...lower to installation loca tion 3 Remove wiring box cover Remove knockouts fromthewiringbox Feed6 ofpowercablethrough openings and attach cables to wiring box with appropriate connectors 4 Wire black to black white to white and green or bare wire beneath green ground screw Replace wiring box cover 5 Attach rough in plate to the studs at the inside top of hood with 4 10 24 nuts provided 6 Connect d...

Page 5: ...oningEngineers ASHRAE et les codes des autorités locales 5 Whencuttingor ATTENTION 1 Cetappareilnedoitservirqu àlaventilationgénérale Ne l utilisez pas pour éliminer des matières ni des vapeurs dangereuses ou explosives 2 Pouréviterd endommagerlesroulementsdumoteur de déséquilibrer les pales ou de les rendre bruyantes débarrassez l appareil de la poussière de plâtre de construction etc 3 Veuillez ...

Page 6: ...rcez unAVANT TROU à travers le toit à une distance de216 mm 8 po durebordintérieurd unCHEVRON De l extérieur sur le toit 3 Mesurez et tracez un rectangle de 527 mm x 521 mm 20 po x 20 po Coupez et retirez seulement les bardeaux qui se trouvent à l intérieur de ce rectangle 4 Mesurez et tracez un ORIFICE D UN DIAMÈTRE DE 279 MM 11 PO et un ORIFICE D UN DIAMÈTRE DE 32 MM 1 PO Découpez ces orifices d...

Page 7: ...le du boîtier et les vis Figure 4 POSE DU VENTILATEUR POSES SUR LES TOITS POSE DU VENTILATEUR 1 Appliquez une large bande de produit à calfeutrer à l arrière du boîtier le long du rebord extérieur 2 Centrez l anneau de ventilateur dans le trou de 27 9 cm 11 po de diamètre en s assurant que l orifice pour le câblage électrique de 3 2 cm de diamètre 1 1 4 po coïncide avec l orifice dans le boîtier d...

Page 8: ...uvertures et fixez les câbles du boîtier de câblage aux connecteursappropriés 4 Branchezlesfilsnoirsensemble lesfilsblancsensemble puis placez le fil vert ou le fil dénudé sous la vis de borne de terre verte Replacez le couvercle du boîtier de câblage 5 Fixezlaplaqueduventilateurauxgoujonssetrouvantsur lapartiesupérieuredel intérieurdelahotteàl aidede 4 écrous no 10 24 inclus 6 Branchez le conduit...

Reviews: