VIKING TECHNICAL SUPPORT 1.800.908.0884
1 7
GATE OPERATOR INSTALLATION
!
TECHNICAL TIP:
Before starting the installation procedure;
• Open and close the gate manually, making sure there is sufficient space between the gate
and adjacent walls.
•
Check that the wheels are turning freely on the track and there are no restrictions while
pushing the gate to the open and closed positions.
• Confirm that there is adequate spacing for the guide rollers and that there are no
restrictions throughout the travel of the gate.
STEP 1
Before securing the chassis to the
concrete pad or posts, make sure
the gate and operator is LEVEL and
PARALLEL. Minimum distance between
the operator and gate is 3”.
STEP 2
Chain Installation: Before welding the
provided chain brackets, make sure the
chain will be in a straight line with, and at
the same height as, the chain leaving the
gate operator rollers.
14.375"