SPRINKLER VK353 (K8.0)

TECHNICAL DATA

Page 4 of 6

Form No. F_071814   19.02.21   Rev 19.1

The Viking Corporation, 210 N Industrial Park Drive, Hastings MI 49058

Telephone: 269-945-9501  Technical Services: 877-384-5464  Fax: 269-818-1680  Email: [email protected]

Visit the Viking website for the latest edition of this technical data page www.vikinggroupinc.com.

Approval Chart 1 (UL)

The Viking Microfast

®

 Quick Response 

Pendent Sprinkler VK353

 

Maximum 175 PSI (12 Bar) WWP

Base 

Part 

Number

1

SIN

Sprinkler 

Style

Thread Size

Nominal K-Factor Overall Length

Listings and Approvals

(Refer also to Design Criteria.)

NPT

BSP

U.S.

metric

2

Inches

mm

cULus

4

VdS

LPCB

              

18274

VK353

Pendent

3/4”

20 mm

8.0

115.2

2-5/16

59

A1X, B1Y

--

--

--

18273

6

VK353

Pendent

1/2”

15 mm

8.0

115.2

2-5/16

59

A1X, B1Y

--

--

--

NOTICE - Product Below - Limited Availability (Contact Local Viking Office)

13975

VK353

Pendent

3/4”

20 mm

8.0

115.2

2-5/16

59

A1X, B1Y

--

--

--

13967

6

VK353

Pendent

1/2”

15 mm

8.0

115.2

2-5/16

59

A1X, B1Y

--

--

--

Approved Temperature Ratings

A - 165 °F (74 °C), 205 °F (96 °C), and 280 °F 

(138 °C)

B - 165 °F (74 °C) and 205 °F (96 °C)

Approved Finishes

1 - Brass, Chrome, White Polyester

5

Black Polyester

5

, and Black 

PTFE

Approved Escutcheons

X - Standard surface-mounted escutcheon

Y - Standard surface-mounted escutcheon or recessed with 

the Viking Micromatic® Model E-1, E-2, or E-3 Recessed 

Escutcheon

Footnotes

1

 Base part number shown. For complete part number, refer to Viking’s current price schedule.

2

 Metric K-factor measurement shown is when pressure is measured in Bar. When pressure is measured in kPa, divide the metric K-factor shown by 

10.0.

3

 This table shows the listings and approvals available at the time of printing. Other approvals may be in process.

4

 Listed by Underwriters Laboratories Inc. for use in the U.S. and Canada.

5

 Other colors are available on request with the same Listings and Approvals as the standard colors.

6

 The 1/2” NPT Large Orifice Sprinkler is Listed and Approved for retrofit only.

DESIGN CRITERIA - UL

 

(Also refer to Approval Chart 1 above.)

cULus Listing Requirements:

 

Quick Response Fusible Element Pendent Sprinkler VK353 is cULus Listed as indicated in the Approval Chart for installation in accordance with the 

latest edition of NFPA 13 for standard spray sprinklers.

• 

Designed for use in Light and Ordinary Hazard occupancies.

• 

The sprinkler installation rules contained in NFPA 13 for standard spray pendent sprinklers must be followed.

IMPORTANT: Always refer to Bulletin Form No. F_091699 - Care and Handling of Sprinklers. Also refer to Form No. F_080614 

for general care, installation, and maintenance information. Viking sprinklers are to be installed in accordance with the latest 

edition of Viking technical data, the appropriate standards of NFPA, LPCB, APSAD, VdS or other similar organizations, and 

also with the provisions of governmental codes, ordinances, and standards, whenever applicable. 

Summary of Contents for 139676

Page 1: ...Element Assembly Nickel Alloy Trigger and Support Stainless Steel UNS S31600 Belleville Spring Sealing Assembly Nickel Alloy coated on both sides with PTFE Tape Seat and Insert Assembly Copper UNS C1...

Page 2: ...ges releasing the seat and spring assemblies to open the waterway Water flowing through the sprinkler orifice strikes the sprinkler deflector forming a uniform spray pattern to extinguish or control t...

Page 3: ...ed not available from Viking TABLE 1 AVAILABLE SPRINKLER TEMPERATURE RATINGS AND FINISHES Sprinkler Temperature Classification Sprinkler Nominal Temperature Rating1 Maximum Ambient Ceiling Temperature...

Page 4: ...ecessed Escutcheon Footnotes 1 Base part number shown For complete part number refer to Viking s current price schedule 2 Metric K factor measurement shown is when pressure is measured in Bar When pre...

Page 5: ...ressure is measured in Bar When pressure is measured in kPa divide the metric K factor shown by 10 0 3 This table shows the FM Approvals available at the time of printing Other approvals may be in pro...

Page 6: ...Figure 4 Sprinkler Dimensions with the Model E 1 and E 2 Recessed Escutcheons Figure 3 Sprinkler Dimensions with a Standard Escutcheon 3 4 NPT 20 mm 2 5 16 59 mm 1 3 4 45 mm Installed with a standard...

Page 7: ...tall sprinklers onto piping at the floor level Install sprinklers after the piping is in place to prevent mechanical damage DO NOT allow impacts such as hammer blows directly to sprinklers or to fitti...

Page 8: ...CAPS MUST BE REMOVED FROM SPRINKLERS BEFORE PLACING THE SYSTEM IN SERVICE Figure 1 Sprinkler shield being removed from a pendent sprinkler Figure 2 Sprinkler cap being removed from a pendent sprinkle...

Page 9: ...these sprinklers NOTE The protective cap is temporarily removed during installation and then placed back on the sprinkler for protection until finish work is completed Do not over tighten the sprinkle...

Page 10: ...the corrosion resistant properties of the sprinkler Use care when locating sprinklers near fixtures that can generate heat Do not install sprinklers where they would be exposed to temperatures exceed...

Page 11: ...tion of fire protection products are provided herin as they relate to legally mandated jurisdictional regions WARNING STATE OF CALIFORNIA USA Installing or servicing fire protection products such as s...

Reviews: