
Performance Checklist
43
□
Verify cabinet size.
□
Verify electrical supply and water supply
(if applicable).
□
Install anti-tip device(s) and verify unit is
secure.
□
Position unit in cutout, level at desired
height, and secure unit.
□
Plug-in unit and verify operation.
□
Connect water supply (if applicable).
• Verify icemaker fill tube is properly
inserted.
• Verify icemaker bailarm is down.
□
Align/square door(s).
□
Verify drain pan is properly installed and
there are no leaks in water connection.
□
Install kickplate.
□
Remove internal packaging and labels
and wipe unit down.
Installer’s information:
Installer’s name:
_____________________________
Installer’s company:
_________________________
Date: ________________________________________
42
Press “ACTIVATE CONTROLS” button pad and close
door.
Note: There is a 6 minute delay before the unit starts.
26
Summary of Contents for VCFB
Page 24: ...47 46 ...