MODEL VG6072
5
PREPARATION STEPS TO FOLLOW BEFORE INSTALLATION
1.
Remove the plastic layer from the base border (if needed). Do NOT remove the plastic layer off
the plastic platform of the base/tub.
2.
Properly apply silicone to the wall and base joints.
3.
Measure your opening to determine if your unit will fit properly. See the chart below to determine
the dimensions.
OPENING DIMENSION
MODEL
24X70
26X70
28X70
30X70
24" - 24 1/2"
IMPORTANT
Ensure that there is sufficient structural support behind the shower wall to hold the weight of the
shower door. If there is insufficient support, then reinforce the shower walls with wooden studs
prior to shower door installation. [SEE FIG.1B]
CAUTION
!
GASKETS NEED TO BE IN BETWEEN ALL GLASS AND METAL CONTACT. FAILURE TO
DO SO CAN LEAD TO BREAKAGE AND POTENTIAL BODILY HARM.
STUD
FIG.1B
26" - 26 1/2"
28" - 28 1/2"
30" - 30 1/2"