8
6175 795 - 03
WAGO Gateway Installation and Service
Quick Start Guide WAGO BACnet
Installation
Install WAGO Gateway
Power up and connect WAGO Gateway to heat generators
via CAN-Bus (91 plug).
H
Power Supply 24VDC (116 mA, 2.8 W)
H
Polarity sensitive (H, and L)
H
Daisy chain using (ISO 11898-2, twisted pair cable,
shielded, or CAT5 / CAT7)
H
End resistors (or dip switch) on both ends of the
daisy chain only
WBM - Configure IP Address
Note:
Commission your boiler(s) before configuring the
automation gateway
Open web browser to https://192.168.1.17/wbm
(admin / wago)
Navigate to Configuration / Networking / TCP/IP
Configuration
Change the IP address, hit Submit button
(IP changes immediately, change URL)
Optional:
H
Configuration / Users - Change passwords for wbm login
H
Configuration / Networking / Routing - (Default)
Gateway Address
H
Fieldbus / BACnet / Configuration - BACnet UDP Port
Web Visualisation - Discover Boilers / add points
Open web browser to https://192.168.1.17 (user / user)
Project Settings
Navigate to General / Project Settings
H
Select Units (Metric / Imperial)
H
Select Application Type (Single or Multiple Devices)
H
Heartbeat Monitoring
- Enabled: BMS must write to “External Request
(MV-1)” a value of “3” for BACnet cyclically, at least
once per 10 sec. or heat generator reverts to internal
control.
- Disabled: “External Request (MV-1)” does not need
to be written cyclically (just once). If connection to
BMS is interrupted, the heat generator continues to
adopt the setpoint that was written last.