background image

2

6175 795 - 03

WAGO Gateway Installation and Service

Safety, Installation and Warranty Requirements

Please ensure that these instructions are read and understood before commencing installation. Failure to comply with 

the instructions listed below and details printed in this manual can cause product/property damage, severe personal 

injury, and/or loss of life. Ensure all requirements below are understood and fulfilled (including detailed information 

found in manual subsections).

  

Product documentation

 

Read all applicable documentation before commencing  

 

installation. Store documentation near boiler in a 

     readily accessible location for reference in the future  

 

by service personnel.

 

For a listing of applicable literature,

     please see section entitled “Important

     Regulatory and Safety Requirements”.

  

Licensed professional heating contractor

     The installation, adjustment, service and maintenance  

 

of this equipment must be performed by a licensed

   professional heating contractor.

 

Please see section entitled Safety and 

 

“Important Regulatory and Installation 

 Requirements”.

  

Advice to owner

     Once the installation work is complete, the heating  

 

contractor must familiarize the system operator/ 

 

ultimate owner with all equipment, as well as safety  

 

precautions/requirements, shutdown procedure, and  

 

the need for professional service annually before the

     heating season begins.

Safety

  

Warranty

     Information contained in this and 

 

related product documentation must 

 

be read and followed. Failure to do 

 

so renders the warranty null and void.

2

Safety, Installation and Warranty Requirements

Summary of Contents for WAGO BACnet/IP

Page 1: ...ons for use by heating contractor BMS communication with heating systems via BACnet WAGO BACnet IP gateway Product may not be exactly as shown Read and save these instructions for future reference IMP...

Page 2: ...For a listing of applicable literature please see section entitled Important Regulatory and Safety Requirements Licensed professional heating contractor The installation adjustment service and mainte...

Page 3: ...ct Information 5 Spare Parts Lists 5 Mounting the Gateway 6 Preparing for Installation 7 Quick Start Guide WAGO BACnet 8 Process Overview 11 Installing the Module 11 Connections and Operating Elements...

Page 4: ...ccidental activation of power during service work Please carefully read this manual prior to attempting installation Any warranty is null and void if these instructions are not followed For informatio...

Page 5: ...product documentation for the following purposes H To monitor systems H To operate systems H To optimize systems With regard to the communication interfaces ensure on site that the system requirements...

Page 6: ...on and Service Mounting the Gateway Installation 1 Loosen the retaining screws from the extension kit enclosure do not remove 2 Remove cover and set aside 3 Mount the extension module enclosure to the...

Page 7: ...rvice Installation Preparing for Installation Legend A Viessmann boiler B Building management system C Terminator 120 D Gateway E Power supply unit F Laptop with web browser and WAGO Web Visu G Module...

Page 8: ...s hit Submit button IP changes immediately change URL Optional H Configuration Users Change passwords for wbm login H Configuration Networking Routing Default Gateway Address H Fieldbus BACnet Configu...

Page 9: ...Installation Add Data points Navigate to Datapoints CAN Status Make sure you see all the heat generators you want to add to the system Select Show Datapoints and Confirm action to discover points Sele...

Page 10: ...rator Set BACnet Device ID Optional Note download the tool from the link on the left 1 Scan the network for BACnet devices 2 Right click on the WAGO Gateway and select Add to Database 3 Switch to the...

Page 11: ...sunlight Operation by unauthorized persons may result in damage to the system Access to the gateway must only be possible for authorized specialists with a key or tool IMPORTANT IMPORTANT Step Respon...

Page 12: ...with terminator See page 14 G CAN low for looping through the CAN bus H CAN high for looping through the CAN bus K CAN bus shield L 24VDC supply voltage connection M Do not open N Operating mode switc...

Page 13: ...AN bus interface has the status Bus Off Short circuit or other serious fault H Check CAN bus connection Plug cable terminator H Check whether boiler is switched on H Check installation and connections...

Page 14: ...Gateway Power supply unit Example BACnet IP gateway 1 Insert a small flat head screwdriver into the opening direcly above the wire 2 Tilt the handle of the screwdriver up 3 Pull the wire straight out...

Page 15: ...ical properties of the cable Only use cable types listed in the following table Only use one cable type within a CAN bus Recommended cable type on site CAN bus cable In line with ISO 11898 2 twisted p...

Page 16: ...tion and Service Establishing the CAN Bus Connection continued Installation Legend A CAN bus shield B Cable for lA for controlling the boiler standard delivery of the gateway Installation and service...

Page 17: ...n attachment until the CAN bus cable has been connected If the gateway is at the beginning or end of the CAN bus Legend A Plug in attachment with terminator standard delivery If the gateway is not at...

Page 18: ...Gateway Installation and Service Establishing the Connection to the BACnet IP Gateway Installation The connection to the network must be established by the system integrator Legend A Connect BACnet IP...

Page 19: ...the Gateway to the Power Supply Unit Installation Connecting cores in the power supply unit Legend A Cable cores between gateway and power supply unit standard delivery The WAGO gateway is supplied in...

Page 20: ...and G are not interchanged IMPORTANT Electrical installations must comply with the latest edition of In the U S A the National Electrical Code NEC ANSI NFPA 70 and any other state local codes and or r...

Page 21: ...k the connections See overview on page 8 4 For further commissioning steps see the WAGO BACnet automation gateway commissioning manual at www automation gateway info LED indicators Status of the LED f...

Page 22: ...95 03 WAGO Gateway Installation and Service Connecting the Plug in Attachment Installation Dismounting the Gateway Dismounting the controller Connecting the Plug in Attachment Dismounting the Power Su...

Page 23: ...Gateway Specifications WAGO BACnet IP gateway Power supply 24VDC Power consumption Max 116 mA Nominal rating 2 8 W Permissible ambient temperature H Operation H Storage H Transport 32 to 104 F 0 to 4...

Page 24: ...Attachment Power Supply Power supply unit Rated voltage 100 to 240V Rated frequency 50 to 60 Hz Rated current 1 34A Output voltage 24VDC Permissible ambient temperature H Operation H Storage and trans...

Page 25: ...d Disposal Additional Information Viessmann products can be recycled Components and substances from the system are not part of ordinary household waste For decommissioning the system isolate the syste...

Page 26: ...26 6175 795 03 WAGO Gateway Installation and Service...

Page 27: ...27 6175 795 03 WAGO Gateway Installation and Service...

Page 28: ...6175 795 03 Technical information subject to change without notice Printed on environmentally friendly recycled and recyclable paper WAGO gateway Installation and Service...

Reviews: