A
Nut for the retaining clip
VL Flow (short connection pipe)
RL Return (long connection pipe)
1.
Remove the retaining clips.
2.
Push the connecting pipes in as far
as possible.
3.
Push the U-pipe in as far as possi-
ble.
4.
Secure the connection pipes and
U-pipe with the retaining clips; click
clips into the groove in the inter-
connecting pipes through the holes
in the collector connectors.
5.
Thread the locking ring fittings onto
the connecting pipe.
6.
Insert the support sleeves into the
interconnecting pipes of the solar
circuit.
Make the connection between the
collector array and pipework of the
solar heating circuit.
Water connections
(cont.)
27
58
62
790
GB
Summary of Contents for VITOSOL300
Page 5: ...Component summary Vertical roof top installation 5 5862 790 GB ...
Page 17: ...Component summary Installation on flat roofs 17 5862 790 GB ...
Page 29: ...A Dual pipe heat exchanger B Clip C Template Water connections cont 29 5862 790 GB ...
Page 33: ...33 5862 790 GB ...
Page 34: ...34 5862 790 GB ...
Page 35: ...35 5862 790 GB ...