3
Installation sequence
Preparing the DHW cylinder.................................................................................
4
■ Without immersion heater.................................................................................
4
■ In conjunction with the immersion heater (on site)............................................
4
■ Safety valve (T&P valve) (required accessory).................................................
4
Elevated installation.............................................................................................
7
■ Ballast and max. load on the substructure........................................................
9
Installation on pitched roofs.................................................................................. 12
Connecting the equipotential bonding.................................................................. 21
Making the connections on the DHW side........................................................... 22
Information on the immersion heater (if installed)................................................ 22
Commissioning and adjustment........................................................................... 23
Index
5719 917 UAE
Summary of Contents for Vitosol 222-T
Page 8: ...8 6 7 5 A B 7 9 4 A Foot support A B Foot support B Elevated installation cont 5719 917 UAE ...
Page 10: ...10 1 6 0 0 4x 9 8 4x 10 3 1 6 Elevated installation cont 5719 917 UAE ...
Page 13: ...13 1 4x 1 5 6 0 2 3 4x 4x Installation on pitched roofs cont 5719 917 UAE ...
Page 14: ...14 5 6 4x 4x 4 4x 7 4x Installation on pitched roofs cont 5719 917 UAE ...
Page 15: ...15 90 9 8x 8 2x Centre rail projections Installation on pitched roofs cont 5719 917 UAE ...
Page 17: ...17 90 90 19 18 2x 4x 4 0 0 6 0 90 17 16 4x 2x Installation on pitched roofs cont 5719 917 UAE ...
Page 18: ...18 90 21 2x 90 20 2x 1 5 9 7 Installation on pitched roofs cont 5719 917 UAE ...