
12
!
Please note
Installing the vacuum tubes
before filling the DHW cylinder
results in thermal loads.
Always
keep vacuum tubes cov-
ered after their installation (tar-
paulin as an accessory) and keep
covered until there is a regular
heat transfer.
90°
14.
2x
Installation on pitched roofs
Information before installation
If an immersion heater (on site) is to be
installed, maintain a minimum clearance
of 450 mm between the DHW cylinder
cover and any walls.
Elevated installation
(cont.)
5719 917 UAE
Summary of Contents for Vitosol 222-T
Page 8: ...8 6 7 5 A B 7 9 4 A Foot support A B Foot support B Elevated installation cont 5719 917 UAE ...
Page 10: ...10 1 6 0 0 4x 9 8 4x 10 3 1 6 Elevated installation cont 5719 917 UAE ...
Page 13: ...13 1 4x 1 5 6 0 2 3 4x 4x Installation on pitched roofs cont 5719 917 UAE ...
Page 14: ...14 5 6 4x 4x 4 4x 7 4x Installation on pitched roofs cont 5719 917 UAE ...
Page 15: ...15 90 9 8x 8 2x Centre rail projections Installation on pitched roofs cont 5719 917 UAE ...
Page 17: ...17 90 90 19 18 2x 4x 4 0 0 6 0 90 17 16 4x 2x Installation on pitched roofs cont 5719 917 UAE ...
Page 18: ...18 90 21 2x 90 20 2x 1 5 9 7 Installation on pitched roofs cont 5719 917 UAE ...