
15
Rear panels
5.
1.
2.
3,5 x 9,5
4.
3.
A
Bundle and secure the LV cables
Note
Pull all external cables through the aper-
tures in the back and front walls into the
control unit wiring chamber.
Installation instructions, boiler
control unit.
Fitting the thermal insulation to the boiler
(cont.)
5458 389 GB
Summary of Contents for VITORADIAL 300-T
Page 17: ...17 Control unit fascia 1 Fitting the thermal insulation to the boiler cont 5458 389 GB ...
Page 19: ...19 Frame flue gas collector 1 4 8 x 9 5 2 mm 6x Mounting the heat exchanger cont 5458 389 GB ...
Page 20: ...20 2 6x 3 A Frame flue gas collector Mounting the heat exchanger cont 5458 389 GB ...
Page 22: ...22 Top plates boiler 2 1 Mounting the heat exchanger cont 5458 389 GB ...
Page 23: ...23 3 3 9 x 9 5 3 9 x 30 Mounting the heat exchanger cont 5458 389 GB ...
Page 30: ...30 Connecting pipes to flange 1 1 Hydraulic connection of the heat exchanger cont 5458 389 GB ...
Page 37: ...37 Side panels 1 2x 2 2x 4 8 x 9 5 Fitting the heat exchanger thermal insulation 5458 389 GB ...
Page 40: ...40 Back panel 1 2 2x 3 9 x 9 5 Fitting the heat exchanger thermal insulation cont 5458 389 GB ...
Page 42: ...42 Top panels 1 2 Fitting the heat exchanger thermal insulation cont 5458 389 GB ...
Page 47: ...47 5458 389 GB ...