Commissioning the system
Operating and service instruc-
tions for the control unit and the
burner
0
1.
Check that the internal pipes are
fully pushed into the hot gas flues
(see chapter "Inserting the internal
pipes"); open the boiler door for
this.
0
2.
Check that the installation room
vent is open.
0
3.
Fill the heating system with water
and vent the system.
Permissible operating pressure:
4 bar
0
4.
Record the fill volume and water
hardness (see chapter "Checking
the water quality").
!
Please note
Scaling may result if the sys-
tem is not operated with fully
softened heating water.
Observe the instructions in
chapter "Water quality
requirements".
0
5.
Check the system pressure.
0
6.
Check the oil level or the gas supply
pressure.
0
7.
Open the flue gas damper (if instal-
led).
0
8.
Check that the cleaning aperture on
the flue outlet is closed.
0
9.
Open the shut-off valves in the oil or
gas line.
10.
Switch ON the mains isolator, the
switch for the heating circuit pump
and the burner ON/OFF switch in
this order (observe the burner man-
ufacturer's instructions).
11.
When heating the system from cold
(also when restarting after mainte-
nance and cleaning work), prevent
any heat supply to the heat consum-
ers in order to clear the dew point
range as quickly as possible.
!
Please note
During boiler heat-up,
unpleasant fumes and
odours can result from gases
being expelled from the ther-
mal insulation, the heating
block and the paint.
Vent the room during com-
missioning.
12.
After the flow temperature has been
reached, switch ON the heat con-
sumers in sequence and change the
burner over to automatic mode.
!
Please note
When testing the flue gas for
CO, internal gases being
expelled from the heating
block can cause higher val-
ues.
Continue to operate the
boiler until a decline can be
clearly recognised.
Commissioning, inspection, maintenance
Further details regarding the individual steps
5692 818 GB