7
For further information regarding the individual steps, see the page indicated
Commissioning steps
Inspection steps
Maintenance steps
Page
•
•
•
1. Commissioning the system
...........................................
9
•
•
2. Shutting down the system
............................................. 10
•
•
3. Closing the Vitoair draught stabiliser (if installed)
...... 10
•
•
4. Opening the boiler door and cleaning cover
............... 10
•
5. Cleaning the turbulators, heating surface, flue outlet
and flue pipe
.................................................................... 11
•
•
•
6. Checking all gaskets and packing cords on the flue
gas side
•
•
•
7. Checking the thermal insulation components on the
boiler door
•
8. Inserting the turbulators
................................................ 12
•
•
9. Securing the boiler door and cleaning cover
............... 13
•
•
•
10. Checking connections and sensor well for leaks on
the heating water side
•
•
•
11. Checking the function of the safety equipment
........... 13
•
•
•
12. Checking the expansion vessel and system pressure
14
•
•
•
13. Checking the firm seating of electrical plug-in
connections and cable grommets
•
•
•
14. Checking the thermal insulation
•
•
15. Checking the water quality
............................................ 15
•
•
16. Cleaning the sight glass in the boiler door
.................. 17
•
•
•
17. Checking the mixer for ease of operation and
tightness
.......................................................................... 17
•
•
•
18. Checking the function of the return temperature
raising facility (if installed)
•
•
•
19. Checking the installation room ventilation
•
•
•
20. Checking the flue pipe for tightness
Commissioning, inspection, maintenance
Steps - commissioning, inspection and maintenance
5692 701 GB