Fig. 5 
Burner power cable connected to sub-base. 

Fig. 6 
Burner harnesses placed in strains relief. 

 

 

 
 

 

 
 
 
 
 
 

 
 
 
 
 
 

 

 

 

 

  

 
 

 

 
 
 
 

 
 
 
 
 
 
 
 
 
 
 
 

 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

NG burner to Vitoflame 200 

(continued) 

Installation

11. Connect gas train to burner and 

support gas train with supplied 
bracket as per the Vitoflame 
200 supplied technical 
literature. 

12. Install supplied double acting 

barometric MG1 vent damper 
on vent connector. 

13. Install FTS-4 spill switch as per 

the FTS-4 supplied instruction.

14. Make final gas connection. 
15. Connect power cable with 7-

pole plug to burner control sub 
base (Fig. 5). 

16. Connect gas train harness (blue 

3-pole plug) and HST4 spill 
switch (white 3-pole plug) into 
plug sockets under burner 
control.  

17. Place the harnesses into strain 

relief located on bottom of the 
front burner plate (Fig. 6). 

 

 

5352 565 v1.0 

Summary of Contents for Vitola VGA Retrofit

Page 1: ...NG burner is produced and tested as the burner for Vitola 200 VB2 boilers with the assumption that combustion air will be supplied from beneath the original burner hood The retrofit burner hood is sm...

Page 2: ...he four bolt mounting pattern Fig 1 and 2 Conversion procedure Remove three bolts and remove mounting flange with blast tube Drill out the blank profile mounting holes and finish the holes with round...

Page 3: ...Open boiler door 4 Remove combustion chamber 5 Clean out the boiler 6 Inspect combustion chamber 7 Reinstall combustion chamber 8 Close and tighten boiler door 9 Replace burner gasket Fig 3 10 Install...

Page 4: ...2 Install supplied double acting barometric MG1 vent damper on vent connector 13 Install FTS 4 spill switch as per the FTS 4 supplied instruction 14 Make final gas connection 15 Connect power cable wi...

Page 5: ...plate and replace it with support bracket extension bolt Fig 7 and 8 19 Fire the burner and make final burner adjustment using a combustion analyzer 20 For Natural gas the CO2 level should be around 9...

Page 6: ...continued 23 Attach burner hood to burner Fig 9 5352 565 v1 0 Installation IMPORTANT Sometimes the installer may experience some fitting difficulties with the gas pipe passing through the cut out ope...

Page 7: ...ion from 2 oil to Natural gas Remember to cap the oil tank filler neck and give a conversion notice to the local oil supplying company Venting system must be inspected and calculated according to loca...