Vitoflex 300-UF Technical Data
Transport and Installation
Precautions must be taken to avoid accidents and injury
during the transportation of the boiler.
Only hoist the boiler when it is entirely empty of water,
fuel and ash.
Lifting
The combustion chamber has four lifting lugs that must
be screwed in before lifting. Lifting gear can be attached to
these lifting lugs.
The pressure vessel of the Vitoflex 300-UF has two lifting
lugs to which lifting gear may be attached.
A special crane (provided by the customer on site) is
required to lift the fire box and the pressure vessel.
Recommended minimum clearances to walls for
installation and maintenance work must be observed.
An anti-vibration boiler support should be provided if
anti-vibration measures are required.
IMPORTANT
A
Lifting lugs (screw in before lifting)
B
Lifting lugs (pressure vessel)
WARNING
Follow instructions for proper installation.
For wood-fired installations:
This wood-fired boiler must be installed in accordance
with local codes if any; if not, follow Installation Code
for Solid-Fuel Burning Appliances and Equipment and
CSA 365 (latest edition).
General Information