The initial start-up and matching of
the control unit to local conditions and
the structural characteristics of the
building, must be carried out by your
heating contractor.
As the user of new combustion equip-
ment, you are obliged to notify the
installation to your local flue gas
inspector (check local regulations).
Your local flue gas inspector will also
inform you (where appropriate) about
work he may be required to perform
on your combustion equipment (e.g.
regular checks, cleaning).
Your heating system is pre-set at the factory
The control unit is preset at the fac-
tory for "heating and DHW", i.e. the
system delivers central heating and
DHW loading (subject to a DHW cylin-
der being installed). Your heating sys-
tem is therefore ready for use.
You may change the factory settings
in accordance with personal require-
ments.
Note
All data is saved in case of power fail-
ure.
Initial start-up
6
Introduction
55
92
453
GB