background image

Installation

3

Replacing the Heating Return Connection Pipe

1.

Loosen screw, remove plug-in
connector and connector pipe

.

2.

Loosen connector and remove
condensate pipe

.

3.

Dismantle the vent system, loosen
the two screws on the vent pipe
adaptor

and remove adaptor.

4.

Remove the plug-in connector and
dismantle the return pipe

.

5.

Loosen the mounting bracket nuts
and remove the heat exchanger

.

6.

Loosen screw and remove plug-in
connector

from the heat

exchanger

.

7.

Attach new plug-in connector

to

heat exchanger

using screw.

8.

Reassemble the boiler in reverse
order. Pay extra attention to correct
installation of gasket

G

onto the

heat exchanger

when

reinstalling the vent pipe
adaptor

.

9.

Fill the boiler with water, flush and
check for leaks.

Vitodens 100
Installation and Service
Instructions

Use new gaskets and pipe sealing
compound on all gas and water pipe
connections

.

Lubricate all hot water O-rings with
supplied lubricant.

E

A

F

C

B

D

G

IMPORTANT

Gas leaks can lead to explosions.
Check gas pipe seals to ensure that
there are no leaks.

WARNING

Summary of Contents for Vitodens 100 WB1A

Page 1: ...er serviceable parts on the boiler burner or control Ensure main power supply to equipment the heating system and all external controls has been deactivated Close main gas supply valve Take precautions in both instances to avoid accidental activation of power during service work Ensure that the installation literature of other applicable components is referenced Removing Front Enclosure Panel 1 Re...

Page 2: ... 3 Loosen the fitting on the gas connection pipe 4 Loosen four screws remove burner and disconnect all electrical cables from blower motor 7826 213 v1 0 CA F C E B A D To avoid damage to the burner do not lay burner on its cylindrical burner tube Failure to heed this caution may cause damage to the burner tube which may lead to improper operation CAUTION ...

Page 3: ...n connector from the heat exchanger 7 Attach new plug in connector to heat exchanger using screw 8 Reassemble the boiler in reverse order Pay extra attention to correct installation of gasket G onto the heat exchanger when reinstalling the vent pipe adaptor 9 Fill the boiler with water flush and check for leaks Vitodens 100 Installation and Service Instructions Use new gaskets and pipe sealing com...

Page 4: ...ann Manufacturing Company U S Inc 45 Access Road Warwick Rhode Island 02886 USA 1 800 288 0667 Fax 401 732 0590 www viessmann us com info viessmann us com 4 Printed on environmentally friendly recycled and recyclable paper 7826 213 v1 0 CA Technical information subject to change without notice Printed on environmentally friendly recycled and recyclable paper ...

Reviews: