Commissioning steps
Inspection steps
Maintenance steps
Page
•
1. Filling the heating system with water and venting
.........................................................
9
•
2. Filling the trap with water
..................................................................................................
9
•
•
•
3. Commissioning the system
...............................................................................................
9
•
•
•
4. Checking the flue gas damper
.......................................................................................... 10
•
5. Checking the gas type
....................................................................................................... 10
•
•
•
6. Opening the boiler
.............................................................................................................. 11
•
7. Conversion to natural gas E
.............................................................................................. 12
•
8. Conversion to LPG P
......................................................................................................... 13
•
9. Reducing the heating output (if required)
........................................................................ 14
•
•
•
10. Checking the static pressure and supply pressure
........................................................ 15
•
•
•
11. Checking the CO
2
content
................................................................................................. 16
•
•
12. Checking the CO content
.................................................................................................. 19
•
•
13. Checking the flue gas temperature
.................................................................................. 19
•
•
14. Displaying the ionisation current
..................................................................................... 19
•
•
15. Shutting down the system
................................................................................................. 19
•
•
16. Opening the combustion chamber
................................................................................... 19
•
•
17. Cleaning the combustion chamber and heating surfaces
............................................. 20
•
•
18. Checking the gaskets and thermal insulation sections
................................................. 20
•
•
19. Checking all connections and the sensor well on the heating water side for
tightness
............................................................................................................................. 21
•
•
20. Cleaning the condensate drain pipe and trap
................................................................. 21
•
•
21. Checking the condensate drain and neutralising system (if installed)
......................... 22
•
•
22. Opening the burner door
................................................................................................... 23
•
•
23. Checking the burner gauze assembly
.............................................................................. 24
•
•
24. Checking the ignition electrodes and ionisation electrode
........................................... 24
•
•
25. Cleaning the burner
........................................................................................................... 25
•
26. Fitting the burner
................................................................................................................ 26
•
•
27. Closing the burner door
.................................................................................................... 26
•
•
28. Checking the gas train valves for tightness
.................................................................... 28
•
•
29. Checking the gas train filter element
............................................................................... 28
•
•
30. Checking the filter element in the gas line
...................................................................... 29
•
•
•
31. Checking gas connections for tightness
......................................................................... 29
•
•
32. Closing the boiler casing
................................................................................................... 30
•
•
33. Checking the gaskets on the flue gas side
...................................................................... 30
•
34. Performing final checks
..................................................................................................... 30
•
•
35. Checking the water quality
................................................................................................ 30
•
•
•
36. Checking the safety valve function
•
•
37. Checking the expansion vessel
....................................................................................... 30
•
•
38. Checking the mixer for ease of operation and leaks
...................................................... 31
Commissioning, inspection, maintenance
Steps - commissioning, inspection and maintenance