Cleaning the sight glass in the boiler door
Check gaskets
A
and hose connec-
tion
B
for leaks.
Closing the boiler door
1.
Tighten the screws on the boiler
door evenly and diagonally.
2.
Install the gas supply pipe and
check for soundness.
Checking the thermal insulation
Check the thermal insulation fit and
adjust, if required.
Checking the mixer for obstructions and leaks
1.
Remove the motorised lever from
the mixer handle.
2.
Check the mixer for ease of opera-
tion.
3.
Check the mixer for leaks. Replace
the O-rings if the mixer leaks.
4.
Snap the motorised lever into
place.
Further details regarding the individual steps
(cont.)
15
Commissioning, inspection, maintenance
56
92
405
GB
Summary of Contents for VITOCROSSAL 300
Page 22: ...Parts lists cont 22 Parts lists 5692 405 GB ...
Page 23: ...Parts lists cont 23 Parts lists 5692 405 GB ...
Page 24: ...Parts lists cont 24 Parts lists 5692 405 GB ...
Page 25: ...Parts lists cont 25 Parts lists 5692 405 GB ...
Page 26: ...Parts lists cont 26 Parts lists 5692 405 GB ...
Page 27: ...Parts lists cont 27 Parts lists 5692 405 GB ...
Page 35: ...35 5692 405 GB ...