7
Commissioning steps
Inspection steps
Maintenance steps
Page
•
•
22. Checking the ignition and ionisation electrodes
......... 24
•
•
23. Closing the boiler door
.................................................. 25
•
•
24. Cleaning the burner
........................................................ 25
•
25. Installing the burner
....................................................... 26
•
•
26. Checking both gas train valves automatically for gas
tightness
.......................................................................... 26
•
•
27. Checking and replacing (if required) the filter
elements in the gas line
•
•
•
28. Checking all gas connections for tightness
................ 26
•
•
•
29. Checking the rotary damper setting
............................. 27
•
30. Implementing final tests
................................................. 28
•
•
31. Checking the water quality
............................................ 29
•
•
•
32. Checking the function of safety valves
•
•
33. Expansion vessel and system pressure
....................... 30
•
•
34. Checking the gaskets/seals on the flue gas side
........ 31
•
•
35. Checking the mixer for ease of operation and leaks
... 32
•
•
•
36. Checking the thermal insulation for firm seating
•
37. Checking the flue gas system for leaks
•
•
38. Checking the ventilation air apertures in the
installation room (only for open flue operation)
•
39. Instructing the system user
........................................... 32
•
40. Operating and service instructions
.............................. 32
Commissioning, inspection, maintenance
Steps – commissioning, inspection and…
(cont.)
5692 908 GB