16
G
F
B
A
D
C
E
Fig. 8
1.
Reconnect the DHW cylinder to the pipework.
2.
Insert
new
gasket
A
underneath flange cover
B
.
3.
Fit flange cover
B
with earth cable
C
.
Max. torque: 25 Nm
4.
Push earth cable
C
onto tab
D
.
5.
Fit thermometer sensor
E
(if available).
6.
Fill the DHW cylinder on the DHW side.
7.
Tighten the flange cover.
Max. torque: 25 Nm
8.
Insert flange insulation
G
and fit oval cover
F
.
Checking the connections on the water side for tightness
Commissioning, inspection, maintenance
Returning the DHW cylinder to use
6150560