7
Siting
!
Please note
Impacts, compression and tensile loads can
cause damage to the outside panels of the
appliance.
Never
put weight on the top or front of the appli-
ance or cylinder jacket.
The DHW heat pump can be transported vertically or
horizontally.
Note for horizontal transport
Set the DHW heat pump upright and allow it to stand
for at least 24 hours
before
commissioning.
Installation room requirements
■
The installation room must be dry and free from the
risk of frost.
■
The intake air must be kept free from dust, grease
and contamination through halogenated hydrocar-
bons (e.g. as contained in sprays, paints, solvents
and cleaning agents).
■
To prevent the transmission of structure-borne noise,
never site the appliance on ceilings with wooden
joists (e.g. in the attic).
■
A separately fused standard power socket must be
available.
■
A condensate drain pipe must be available.
■
Always maintain the minimum clearances for service
and maintenance work.
Fig. 1
Preparing for installation
Preparing for installation
5788 057 GB
Installation