I.   Liability on Orders of Confirmation, Altering and Cancel-

ling Orders

 

1.  If nothing different has been agreed on for the scope and exe-

cution of delivery, the order confirmation from the supplier is 
authoritative. If the technical data of the individual items of the 
scope of delivery are no longer listed in the order confirmation, 
the technical data of the most recent quotation apply. 

2.  If the order of the purchaser is also valid for the order confir-

mation, this is expressly stated on the order confirmation of 
the supplier with indication of precedence. 

3.  Insofar as there is no verifiable contradiction within 10 days of 

delivery of the order confirmation, the contract applies as con-
cluded according to the order confirmation. In the case of de-
livery times shorter than 30 days, the time limit for objections 
is reduced to 30% of the delivery time. 

4.  Order changes or cancellations after expiry of the time limit for 

objections only apply if the supplier has declared its agree-
ment in writing. In addition, the costs arising thereof must be 
borne by the purchaser. 

 

II. Prices

 

1.  The pricees listed in the general documentation of the supplier 

(price lists) can, as a basic rule, be changed at any time with-
out advance warning.  

2.  All prices listed in the supplier's documentation are to be un-

derstood ex works excluding VAT. 

 

III. Illustrations, Properties and Technical Terms

 

 

All technical data, illustrations, measurements, diagrams and 
weights specified in bids, remain non-binding until they are 
part of a binding documentation delivered in connection with 
an order of confirmation. All rights for construction related 
changes remain reserved. Materials may be replaced by 
equivalent alternatives.  

 

IV. Copyrights and Ownership of Technical Drawings and 

Documentations 

 

Technical drawings and documentation that are handed to the 
buyer but do not form an integral part of the equipment and its 
applications, remain the property of the supplier. Only with the 
written consent of the supplier, may documents be passed on 
to third parties in a changed form or in the original form. 

 

V.  Copyright and title to the control programs

 

  Control programs used to control the equipment remain the 

property of the supplier. With the full payment of the equip-
ment, the buyer receives life-long, unrestricted user rights to 
the control programs. 

 

VI. Terms of Delivery

 

1.  If delivery dates are expressly agreed upon, they are binding. 
2. Technical clarifications about all construction dimensions in-

fluencing the scope of delivery (loading device designed spe-
cifically for the building) must be submitted according to the 
following minimum deadline:  

 

42 days for systems with standard components  

 

70 days for portable building systems 

 

Multiple-boiler systems (complex large-scale systems) accord-
ing to arrangement with the supplier. 
If the technical clarification does not permit production on time, 
for which the supplier is without blame, the supplier is excused 
from the deadline commitment. 

3.  The supplier is entitled to withhold 

the delivery if the agreed payment conditions have not been 
fulfilled by the purchaser. 

4. If verifiable consequential costs arise for the purchaser 

through delayed deliveries, the contractual parties shall nego-
tiate in regard to an amicable solution. 

5.  If the ordered goods are not accepted on the agreed delivery 

date, the supplier is entitled to issue an invoice for the goods. 
The contractual parties shall negotiate in regard to an amica-
ble solution over the consquential costs of storage. 

6.  In the case of order on call, the supplier retains the right to 

only produce the ordered goods after receipt of the call. 

 

VII. Shipment /Transportation

 

1.  The supplier uses the type of packaging materials and means 

of transportation he deems suitable.  

2.  If no other agreement exists, the equipment is sold ex-factory. 

Furthermore, the INCOTERMS of the day of the contract sign-
ing is valid. 

3.  Should parts of the equipment be shipped individually at the 

buyer's request, then the additional cost will be to his account. 

 

VIII. Installations by the Supplier

 

1.  Has the mode of transportation and installation of the equip-

ment been agreed upon, then the buyer is obligated to prepare 
the installation site on time and in the manner stipulated. 
These required preparations are listed in the confirmation of 
order under the position "Installation". 

2. In general, a paved pathway suited for trucks that bring the 

equipment to the site must be prepared.  

3.  Furthermore, before installation starts, the masonry, carpentry 

and other preparatory work has to be moved along far enough 
so that upon delivery of the equipment, the installation techni-
cians can take up their duties right away and carry them out 
without interruptions. 

4.  If installation must be interrupted as a result of insufficient pro-

gression of the of the masonry, carpentry or other workman-
ship, the purchaser must store the uninstalled items included 
in the scope of delivery and undertake all measures that would 
be made for the protection of its own property. The cost arising 
from the delay and additional travel expenses of the installa-
tion technicians are to the buyer's account. 

 

IX. Inspection/Complaints during Handover

 

1.  The purchaser is obligated to inspect the goods immediately 

on receipt. If the goods obviously do not correspond to the de-
livery note or exhibit visible defects, the purchaser must im-
mediately indicate this on the delivery note in writing. If it ne-
glects to do so the delivery and service apply as accepted. 

2.  A notice of defects not made on a timely basis also has the 

consequence of forfeiture of the supplier's warranty deed 

3.  If the purchaser would like an inspection inspection, this must 

be agreed upon in writing and, unless otherwise agreed upon, 
goes to the expense of the purchaser. Should the handover 
inspection for whatever reasons (that the supplier needs not 
stipulate), be delayed, then the specifications that are to be 
checked shall count as met until the opposite is proven. 

4.  Complaints do not void terms of payment. 
 

Summary of Contents for KOB PYROMAT DYN 45

Page 1: ...Instructions for Assembly and Installation PYROMAT DYN 45 to DYN 85 5726 786 GB 10 2009 Version 0 1 Please keep safe...

Page 2: ...by K b Holzheizsysteme GmbH Flotzbachstra e 33 A 6922 Wolfurt All rights reserved including photomechanical re production and storage in electronic media Viessmann Group...

Page 3: ...Automatically Triggering System for the Material Supply System ATSMS 7 7 2 2 Slide valve type MBA 7 7 2 3 Rotary valve type MBS 7 7 2 4 Double rotary valve with pressure compensation 7 7 3 Fire protec...

Page 4: ...with European Standard EN 303 5 1999 In addition the PYROMAT DYN meets all European national deviations relating to tightened regulations relevant to emission limits and efficiencies Austria Art 15a...

Page 5: ...AT DYN is equipped with an exhaust blower and so it is a fireplace not requiring a draft The design of the chimney should be carried out as for a fireplace with an oil or gas blast burner not requirin...

Page 6: ...on the opposite side feed side Screw the lid tight to the motor and rod assembly and connect the electric line Run the squared shaft end from the de ashing agi tator through the drilled hole in the gr...

Page 7: ...lid flange Unplug plugs 6 remove servomotor burner con trol valve 4 and unscrew screws on the rear wall 5 Light barrier ember monitoring system receiver EO98VB3S770 Abbreviated designation B 1G 2 Tran...

Page 8: ...con densation of the exhaust gases the burner tem perature must in no case be less than 70 C For this a burner circuit pump should be provided with a boiler control valve according to the diagram Spec...

Page 9: ...he fire protection regulations for wood heating systems vary for each specific country The regulations valid for the respective place of installation must be complied with 7 1 Protection for the burne...

Page 10: ...pproved in non pressurised fuel storage units for all cases and according to TRVB 118 test certificate BV 2979 89 is considered as a suitable back burn safeguarding device 7 2 3 Rotary valve type MBS...

Page 11: ...ty valve mounted on burner and or burner inlet 4 Thermal run off safety valve connected to the cold water mains 5 The sensor for the thermal run off safety valve is in the dipping shell 6 The containe...

Page 12: ...ulating valve as per the diagram The burner circuit should be configured such that the temperature difference between the forward and return flow is equal to or less than 15 C This is given in the des...

Page 13: ...P S 30 7 EM VXG48 40 SQS35 00 NW 50 R 1 NW 32 1 Connecting thread for inlet 2 Length of the exhaust pipe up to 4 0 m for longer lines see DIN 4751 Part 2 c Designation of the motors sensors and safety...

Page 14: ...a burner circuit pump should be provided with a modulating valve as per the diagram The burner circuit should be configured such that the temperature difference between the forward and return flow is...

Page 15: ...the motors sensors and safety switches Motors Electrical probes and sensors M1 Exhaust blower B1G 1 Transmitter light barrier for embers opposite slide in module M2 Feed auger B1G 2 Receiver light ba...

Page 16: ...ted in metal 1 2 with fixed pipework K SLE and K SLV It must not be possible to shut off the cold water inlet without the aid of tools Be especially sure to comply with Point 5 of the Installation Ins...

Page 17: ...y tap VBF 21 80 80 100 SQL 33 Counter flange seals ZH 3 100 7388165 3 way tap VBF 21 100 100 160 SQL 33 Counter flange seals ZH 3 125 7388053 3 way tap VBF 21 125 125 550 SQL 33 Counter flange seals P...

Page 18: ...nection LVW 65 Art No LVW 65 V 7387862 Connecting two model LVW 65 manifolds produces a manifold for four to six consumer groups The connection is assembled at the factory to assure an accurate fit He...

Page 19: ...leakage losses One ball valve with screwed connection for mounting on motor valve VXG 48 25 SSY 319 with pump connection on bottom One ball valve with thermometer socket and screwed connection with pu...

Page 20: ...is transferred to the boiler water The vertical surfaces of the heat exchanger are regularly cleaned by motor driven moving coil springs The speed controlled exhaust blower was specially designed for...

Page 21: ...tors refer to spec sheets Category 4 The operation of the heating control units is all carried out in the control module for the burner system Each controller is operated by a separate pushbutton For...

Page 22: ...nal heat output g s 35 56 68 Average exhaust gas temperature at maximum nominal load C 138 136 134 Average exhaust gas temperature at minimum nominal load C 79 78 77 Maximum water content forest wood...

Page 23: ...achstr 33 A 6922 Wolfurt Tel 43 5574 6770 0 Fax 65707 E Mail office kob cc Subject to technical changes 3010 4 2009 03 01_GB Dimensional drawing Feed auger available either left or right turning Right...

Page 24: ...00 100 S Connection for exhaust blower 1 200 200 200 T Width of firebox 550 550 550 U Depth of firebox 300 400 400 W Outlet exhaust blower 293 293 293 Z Slide in module flange 650 765 800 a Connection...

Page 25: ...r is insulated and cased in powder coated steel plate When operated according to the operating instructions dust emissions even when chips are incinerated are under 150 mg Nm based on 13 residual oxyg...

Page 26: ...er ECO S1 1 1 2 4050 Controllers for solar systems Solar domestic water heating system ECO S3 1 2 2 4050 Modules and combinations possible see Spec Sheet 4020 Extra charge for control system module Ex...

Page 27: ...th Extended Keyboard Art No ECO 13 7387820 A control module with an additional row of buttons to operate a maximum of 12 controllers PYROMAT DYN PYROT 13 controllers Pyromat ECO Data transmission line...

Page 28: ...ol module in the heating room Version 2 Decentral control system module e g in annex building Only one control module possible Visualization with PC for extra cost please refer to Data Sheet 4090 Cont...

Page 29: ...0 0 Fax 65707 E Mail office kob cc Subject to technical changes 4020 3 2009 03 01_GB Example of how to connect the CAN BUS cables for the PYROT Control system module 1 3 possible Visualization with PC...

Page 30: ...nto operation the additional heat generator disconnects and the closed shut off valve prevents it from being flowed through The boiler temperature is variably regulated to a minimum temperature accord...

Page 31: ...troller output for pump 1 mixing valve 2 and burner 3 Note Only for PYROMAT DYN without ECO function and PYROT with hydraulic switcher See Hydraulic Drawing 3950 PYROMAT ECO or 6960 PYROMAT DYN with E...

Page 32: ...n for annex building Controller output for pump 1 mixing valve 1 and changeover valve 3 Flow sensor QAD 21 uninstalled Domestic water sensor QAZ 21 5220 with dipping shell x 200 mm uninstalled Thermos...

Page 33: ...rerequisite The heating times day and week program can be adjusted via the integrated timer Scope of delivery Pushbutton for domestic water heater Controller output for pump 1 and shut off valve 2 Dom...

Page 34: ...rcuit is for heating the heat accumulator at the back bottom and the third circuit is for heating the heat accumulator at the front top The heat accumulator is heated by an externally situated plate h...

Page 35: ...n series T T T T M II IV 3 I 1 4 2 example 3 accumulators in series I solar collector II solar station with solar pump III thermostatic water mixer IV plate heat exchanger 1 solar pump 2 intlet valve...

Page 36: ...customer Operating system Windows 98 2000 XP Available hard disk storage space at least 50 MB RAM at least 128 MB RAM Per boiler 1 available serial interface Visualisation Supplementary Function Art...

Page 37: ...d Draining the heating room and silo room with all the ducts and shafts required for installing the entire facility e Unloading the scope of the delivery from the truck unless the delivery has been ex...

Page 38: ...of the delivery Due to the great forces that develop this performance should be furnished according to the instructions of an expert architect or structural engineer in accordance with the supplier s...

Page 39: ...2 Superfines dust wood particles smaller than 1 0 mm as per NORM M 7133 2 1 Without pre dryer max 10 0 of the total mass consequence of substantial overstepping of limit Temperature peaks Slag format...

Page 40: ...remnants D 40 to 60 mm k1 S 650 less than W10 Pellets conforming to standards untreated D 6 to 10 mm k2 S 650 less than W10 Pellets conforming to standards untreated D 11 to 15 mm 6 Maximum water cont...

Page 41: ...the technical clarification does not permit production on time for which the supplier is without blame the supplier is excused from the deadline commitment 3 The supplier is entitled to withhold the...

Page 42: ...t in the fire proof coatings surface wear wear around the edges cracks etc that do not lead to any malfunction of the equipment are not covered by warranty New parts carry the stipulated new parts war...

Page 43: ...e 73 23 EEC Low Voltage Directive 89 336 EEC EMC Directive 97 23 EC Pressure Equipment Directive Applied standards EN 303 5 DIN 4702 Solid fuel burners manual and automatic feeder systems EN 60335 1 A...

Page 44: ...K b Holzheizsysteme GmbH Flotzbachstrasse 33 A 6922 Wolfurt Tel 43 55 74 67 70 0 Fax 43 55 74 65 7 07 office kob cc www kob cc Viessmann Group www viessmann com...

Reviews: