18
Arrangement of excess export system when con-
nected into a sub-distribution board
RCD
RCD
M
400V / 230V~
N
L
K
H
kWh
Z2
1~
B
C
F
G
E
~
P
O
kWh
Z1
kWh
A
D
S1
Fig. 7
A
Vitovalor PT2
B
Fuel cell module ON/OFF switch
C
Gas condensing module ON/OFF switch
D
Control unit, gas condensing module
E
Internal circulation pump
F
Internal consumers
G
GS protection
H
Sub-distribution board
K
On-site consumers
L
Meter cupboard
M
Property boundary
N
Low voltage grid
O
Inverter (DC/AC converter) S
EMAX
= 0.75 kVA
P
Fuel cell stack
S1 Bidirectional energy management meter (not rele-
vant for billing by the grid operator)
Z1 Balancing bidirectional meter
Z2 Export meter (standard delivery on Vitovalor PT2)
Arrangement of excess export when connected
into a main LV distribution board
RCD
RCD
kWh
Z1
L
AC 400V / 230V~
M
K
H
kWh
Z2
1~
F
G
E
kWh
S1
~
O
N
B
C
A
D
Fig. 8
A
Vitovalor PT2
B
Fuel cell module ON/OFF switch
C
Gas condensing module ON/OFF switch
D
Control unit, gas condensing module
E
Internal circulation pump
F
Internal consumers
G
GS protection
H
Meter cupboard
K
On-site consumers
L
Property boundary
M
Low voltage grid
N
Inverter (DC/AC converter) S
EMAX
= 0.75 kVA
O
Fuel cell stack
S1 Bidirectional energy management meter (not rele-
vant for billing by the grid operator)
Z1 Balancing bidirectional meter
Z2 Export meter (standard delivery on Vitovalor PT2)
Preparing for installation
Notes on connecting to the mains supply
(cont.)
5853335
Installation