51
For further information regarding the individual steps, see the page indicated
Commissioning steps
Inspection steps
Maintenance steps
Page
•
•
•
1. Opening the heat pump
.................................................. 52
•
2. Writing reports
................................................................ 52
•
•
•
3. Checking the refrigerant circuit for leaks
..................... 53
•
4. Filling and venting on the primary side
........................ 53
•
5. Filling and venting on the secondary side
................... 54
•
•
•
6. Checking the expansion vessel and heating circuit
pressure
........................................................................... 57
•
7. Cleaning the DHW cylinder
............................................ 57
•
8. Replacing the magnesium anode
.................................. 59
•
•
9. Checking the tightness of electrical connections
•
•
•
10. Closing the heat pump
•
•
•
11. Closing the heat pump, switching on main fuse/MCB
•
12. Commissioning the system
........................................... 59
•
•
•
13. Checking the system function (e.g. actuators,
temperatures, poss. heat meter)
................................... 66
•
14. Instructing the system user
........................................... 66
Commissioning, inspection, maintenance
Steps - commissioning, inspection and maintenance
5601 574 GB
Service
Summary of Contents for BWT 221.A06
Page 20: ...20 aCH 10 9 Installation sequence Siting the heat pump cont 5601 574 GB ...
Page 22: ...22 4x 18 21 4x 6x 20 2x 19 Installation sequence Siting the heat pump cont 5601 574 GB ...
Page 23: ...23 25 2x 24 4x 22 23 Installation sequence Siting the heat pump cont 5601 574 GB Installation ...
Page 28: ...28 4 1 3 2 Installation sequence Siting the heat pump cont 5601 574 GB ...
Page 71: ...71 Opening programming unit 2 2x 1 3 Troubleshooting Repairs cont 5601 574 GB Service ...
Page 122: ...122 5601 574 GB ...
Page 123: ...123 5601 574 GB ...