If necessary, adjust feet from 75 mm to 50 mm (pull out and turn).
Drill floor holes (10 mm).
Attach base element to the floor using the screws and dowels sup‐
plied (size 13).
Determine construction height in accordance with the on-site
marking of the upper edge of the finished floor.
Align base element upwards, observe installation height marking.
INFO! The construction height must be determined and
adhered to exactly.
There are only limited possibilities available to remedy errors
made during this assembly step,
On-site support profile
90°
50
75
Ø10
13
0-200
0
1
0
0
0
Handling
Viega Eco Plus basic element
10 from 11