Check the insertion depth in the inspection window.
Open the press jaw and place at a right-angle onto the connector.
Start the pressing procedure.
ð
Connection is pressed.
3.2.4
Leakage test
The installer must perform a leakage test before commissioning.
Carry out this test on a system that is finished but not yet covered.
Comply with the general rules of engineering and the applicable direc‐
tives, see
„Regulations from section: Leakage test“ on page 7
Perform leakage test should in acc. with the general rules of engineering
for non-potable water installations.
Document the result.
3.3
Maintenance
NOTICE!
Inform your customer or the operator of the drinking water
installation that the system has to be maintained on a reg‐
ular basis.
Observe the applicable regulations for the operation and maintenance
of drinking water installations, see
„Regulations from section: Mainte‐
Handling