3 Handling
3.1
Assembly information
3.1.1
Mounting conditions
With the construction height, the marked height of the upper edge of
the finished floor must be observed.
The actuation takes place via manual flush actuation, connection of the
Visign equipment set.
3.1.2
Required tools
The following tools are required for mounting the urinal module:
n
fork or ring spanner: 17 mm / 19 mm
n
Phillips-tip screwdriver
3.2
Assembly
3.2.1
Mounting module
The two vertical rails, which surround the module, must be
open towards the module and be at an interval of 430 mm.
Secure the module onto the open Steptec rail with the slot nuts sup-
plied:
Insert the slot nut into the opening of the module.
Construction height
Actuation
Mounting in Steptec
Securing module
Handling
Urinal module
9 from 15