Page 5 DCRE485 0600
Installation
The installation must be carried out only by qualified technical staff
.
The following procedures must be carried out with power supply off, if not otherwise specified.
Unpacking
If the packing shows no relevant defects (due to falls or anomalous abrasions), check the material contained,
according to the list given at paragraph
Packing contents
chapter
Introduction
.
The packing materials can be completely recycled. The installer technician is required to dispose of them according to
the differentiated collecting modalities or ,anyway, according to the normative laws in force in the Country of use.
Check of identification data
Before installing the appliance, check that the material supplied corresponds to the specifications indicated on
the data plate, following the chapter
Identification data
. Do not carry out any modification or connections which are not
provided for in this manual: the use of improper appliances may seriously compromise the safety of the personnel and
the installation.
Connectors and connections
The DCRE485 unit features 9 RJ11 connectors located at the rear of the mechanics and one protection fuse:
Each line in RS485, both in input and in output, have the termination resistance inserted.
The
transmission
of digital data from the outputs takes place simultaneously in RS485 on the 8 outputs.
Serial outputs RS485
Serial input RS485
Power supply
Fuse 63 mAT 250V
Summary of Contents for DCRE485
Page 1: ...MANUALE D USO OPERATING INSTRUCTIONS MANUEL D INSTRUCTIONS BEDIENUNGSANWEISUNG...
Page 2: ......
Page 3: ...MANUALE D USO...
Page 4: ......
Page 12: ...Pag 8 DCRE485 0600...
Page 13: ...OPERATING INSTRUCTIONS...
Page 14: ......
Page 22: ...Page 8 DCRE485 0600...
Page 23: ...MANUEL D INSTRUCTIONS...
Page 24: ......
Page 32: ...Page 8 DCRE485 0600...
Page 33: ...BEDIENUNGSANWEISUNG...
Page 34: ......
Page 42: ...Seite 8 DCRE485 0600...
Page 43: ......
Page 44: ......