background image

- 11 -

8. Connect the clutch cord to the trolley.

9. Release the clutch by pulling down the clutch cord. Try to open and close the door by

hand. Make sure there is no abnormal resistance between door panel and track along

the whole travel.

10. Connect the opener with power supply and set up the opener.

Notice: Make sure the opener’s voltage is in accordance with the local voltage. Connect

the opener to a properly earthed power supply.

Installation (sectional steel track)

Put the trolley into the track

FIG. 13

Summary of Contents for VT 1000E

Page 1: ...d the manual carefully before installation and use The installation of your new door opener must be carried out by a technically qualified or licensed person Attempting to install or repair the door o...

Page 2: ...4 11 Installation sectional steel track 11 Installation recommendations 12 Basic function setting and applying 13 14 Special function introduction and application 15 Manual disengagement 16 Maintenan...

Page 3: ...ipment such as locks not needed for powered operation Check that the door is in good mechanical condition correctly balanced and opens and closes properly 4 A weighted emission sound pressure level of...

Page 4: ...r the object can be freed when the door contacts a 40mm high object placed on the floor 20 The drive must not be used with a door incorporating a wicket door unless the drive can not be operated with...

Page 5: ...curity protection 7 Low voltage protection the process will not perform any action of opening and closing when voltage is too low door panel and controller won t be damaged 8 We adopt rolling code tra...

Page 6: ...iction points 4 The door must be properly balanced and must be easily lowered and raised by hand 5 Install a 220V adequately protected 3 pin socket near Where the GDO is going to be installed FIG 1 FI...

Page 7: ...5 Installation steel track FIG 3 FIG 4...

Page 8: ...s corresponding to the bracket Mount the track bracket to the wall with fourM8 40 lag screws by a 1 2 inch socket FIG 5 2 Mount the steel track to the bracket Align the holes in the bracket and the ho...

Page 9: ...U hanging brackets A to the four studs respectively The studs shall be through the holes on the U hang bracket A and thus the whole assembly can be mounted by fourM4 nuts At this point the whole asse...

Page 10: ...nting points on both of the iron angle A where the distance between the measure the distance between the mounting points and ceiling enable the track to be horizontal when hanging Then mount the hangi...

Page 11: ...iling by two M8 screws Make sure the whole assembly is steady 6 The connection of panel bracket and panel connector refers to the installation of aluminum track 7 Connect the door and the garage door...

Page 12: ...10 Move the trolley to an appropriate position in order to connect the bent arm and the straight arm by two pairs of M6 nuts and M6 bolts FIG 11 FIG 12 Clutch Cord M6 Bolt M6 Nut Cotter pin Trolley...

Page 13: ...ere is no abnormal resistance between door panel and track along the whole travel 10 Connect the opener with power supply and set up the opener Notice Make sure the opener s voltage is in accordance w...

Page 14: ...may be subject to damage if the control unit is abused 5 Make sure that you have all the necessary materials and they are suitable for this kind of use 6 Read all the instructions thoroughly and make...

Page 15: ...ber the limit positions and the opening closing force Press CODE button and hold on until the LED dot flashes Fig A Then press any button except the lock button on the transmitter twice the dot will b...

Page 16: ...ose after the set time Press DOWN button and hold on until the LED displays 11 press UP button the LED displays H photo beam function is available Press DOWN button the LED displays 11 to cancel this...

Page 17: ...92MHz frequency and same ASK301 rolling code will be able to be received by the opener receiver 2 Caution light function There are corresponding accesses for this function and provide 24v 35v caution...

Page 18: ...ndle down FIG 19 Pull on the handle to disengage the shuttle To re engage the door simply run opener in automatic mode or move door by hand until the trolley engages in the chain shuttle In some situa...

Page 19: ...ance with the local voltage and the power is within 25 Watt Demount the screws on the lamp cover Take the lamp cover away then twist off the old light bulbs anti clockwise Fix the new lamp bulb and la...

Page 20: ...cord Inform the owner about the need of a regular and accurate maintenance especially regarding a regular check of the safety and reversing devices Important information for the user Once the opener...

Page 21: ...Door opener 1 Track incl Clutch 1 Remote control 2 Door bracket 1 Wall bracket 1 U bracket 2 Hanging bracket 2 Track bracket 1 Clutch cord 1 Cord pendant 1 Straight arm 1 Bent arm 1 Fixing kit 1 Wall...

Page 22: ...vered by this Vicway Australia Pty Ltd Warranty It is also a condition of the Vicway Australia Pty Ltd Warranty that the Unit is serviced by a Vicway Australia Pty Ltd Service Technician within the fi...

Page 23: ...operating application Liability Australia only Under no circumstances shall the Seller be liable for consequential incidental or special damages arising in connection with the use or inability to use...

Page 24: ...22 Contact Details VICWAY AUSTRALIA PTY LTD 20 EARL STREET AIRPORT WEST VIC 3042 Phone 03 9338 6698 1300 783 591 Fax 03 9338 6639 Email enquiries vicway com au...

Reviews: