Series 756 FireLock
®
European Dry Valve Stations
20
5.
Confirm that all alarms operate properly.
6.
Continue to run water until it is clear.
7.
Close the water supply’s main control valve (2).
8.
Close the piston charge line ball valve (8).
9.
Close the slow-fill ball valve on the air maintenance device
(28).
10.
Perform all steps in the “Placing the System in Service”
section, starting on page 11.
2
8
28