21
1. Right side part of the shell
2. Washer 5,3
3. Screw M5 x 10
4. Left side part of the shell
5. Screw M5 x 10
6. Washer 5,3
7. Draught controller
8. Thermomanometer
9. Upper part of the shell
10. Rear part of the shell
11. Screw ST 4,2 x 9,5
Fig. no. 17 Boiler shell
5.2.4 Mounting of draw bar of smoke flap control
1.
Complete the smoke flap control according to the Fig.no.18.
2.
Fasten the draw bar of the smoke flap control (2) to the smoke flap (1) by means of a lock 2,5 x 32 (3).
3.
Screw the plastic ball M10 (4) on the front part of the draw bar
4.
Stick the label of the smoke flap control.