The gas flow is specified at the gas  temperature and  0 °C and 1013,25 mbar air pressure  For a particular 
temperature and  pressure the real consumption is calculated as follows : 

 

1013,25 . (273 + t) 

V =  V

E . 

---------------------------------------- 

p . 273 

 
V - 

gas volume at a given pressure and temperature

 

V

E - 

gas volume at 0°C and 1013,25 mbar 

t - gas 

temperature (°C) 

p - 

absolute gas  pressure (mbar) 

273 - 

absolute temperature (K) 

 

 
 

3. Description 
 

3.1.

Boiler construction 

 

The boiler drum (see Fig. no. 1 – individual  positions) consists of sections by means of forced on 

insertions and secured by anchor bolts.  The boiler has three-draught construction and the combustion chamber 
and the convective part are created by sections; the boiler water space is inside. The boiler tightness is 
guaranteed by the  packing cord inserted in a groove   on four sides of individual sections and the combustion 
chamber plus the silicon sealant  deposited in grooves at the point of sections joint after boiler drum constriction.   
 

On the  frontal section is   there is mounted closing plate with insulation  which can open either to the left 

or to the right hand side. This must correspond with hinges and closures position.  The flange for burner is a part 
of closing plate.  On the flange there is placed a sight glass with a probe for measuring the overpressure   in  
combustion chamber. 
The opening  

φ

 126 mm in the upper part of the frontal section is closed by a flange with boring  3 x G 1/2“  for 

the reservoir of thermostat, safety  thermostat and thermometer and the reverse valve of manometer.  In the 
lower part of the frontal section there is an opening 

φ

 126 closed by a blank flange.  

 

Input and output of heat carrier are situated on the rear section and is carried out by means of flanges with 

a sleeve  DN 100 and  intermediate flanges  DN 100. On the lower sleeve there is the discharge cock  G 3/4“. 
The restricting insertion belongs to the flange with the sleeve for heat carrier input.  In the riser above the lower 
flange with a sleeve there is positioned the outside protective clamp of boiler.  In the upper and lower parts of 
the rear section there are four  small  covers for cleaning.   

Flue gases are carried away from  boiler through the outlet neck positioned on the flue  collector. Under the 

outlet neck there is the explosive flap with a holder.  On the outlet neck there are the measurement points  for 
temperature and  flue gases analysis. . 
 

The boiler drum is perfectly insulated by the mineral wool plates 100 mm thick. The steel shell  of  boiler  

is suspended on two consoles of the shell positioned next to upper anchor bolts. The surface is treated by 
comaxit paint. In the frontal part of boiler there is installed the electric panel in which there are  installed the 
switching, regulation and safety  elements and the wiring block. 

 

Summary of Contents for G 700

Page 1: ...1 MANUAL for boiler operation and installation VIADRUS G 700...

Page 2: ...k in low pressure boiler rooms Thereby a long time and trouble free boiler operation will be guaranteed to both your and our satisfaction VIADRUS G 700 boiler was approved to be operated in the Czech...

Page 3: ...ts setting 15 7 2 Electric panel 15 8 Maintenance 17 9 Instructions for product disposal after its service life 17 10 Guarantee and liability for defects 18 Purchase order Purchase order specification...

Page 4: ...ure at maximum 4 bar operating overpressure The boiler drum is tested by 8 bar testing overpressure Boiler advantages are as follows 1 Longstanding service life of cast iron boiler drum 2 Highly econo...

Page 5: ...bar 0 9 1 4 2 2 3 2 5 6 2 Recommended chimney draught mbar min 0 2 Boiler water volume l 252 277 302 327 352 377 Pressure loss on water side dt 20 K mbar 0 9 1 35 1 9 2 6 3 34 4 2 dt 10 K mbar 3 4 3 9...

Page 6: ...in combustion chamber The opening 126 mm in the upper part of the frontal section is closed by a flange with boring 3 x G 1 2 for the reservoir of thermostat safety thermostat and thermometer and the...

Page 7: ...7 Fig no 1 Boiler assembly...

Page 8: ...8...

Page 9: ...onsole of shell 23 connecting console 24 side part of shell frontal left 25 side part of shell frontal right 26 side part of shell 27 side part of shell rear 28 frontal part of shell segment 2 right 2...

Page 10: ...10 4 2 Electric wiring diagrams Fig no 2 Electric panel wiring diagram...

Page 11: ...nalling MPH1 burner stage 1 service hours meter MPH2 burner stage 2 service hours meter BT3 burner stage 2 thermostat X20 burner connector NOTE Water pressure manostat PS1 only in design for MORA firm...

Page 12: ...12...

Page 13: ...13 Fig no 3 Electric panel wiring diagram...

Page 14: ...ust be left a free handling space minimum up to the boiler depth 500 mm from one side 600 mm access to the back rear access 800mm and 500 mm between two boilers When installing the boiler we must cons...

Page 15: ...8 MPa b regarding the gas distribution SN EN 1775 1999 Gas supply Pipelines in buildings Maximum service overpressure less than 5 bar SN 38 6413 1990 Gas conduits and connections with low and medium...

Page 16: ...h and oak wood hobrex boards plywood werzalit umakart sirkolit C2 medium combustible Pinewood larch whitewood chipboard and cork boards rubber flooring C3 easily combustible Asphalt board fibreboards...

Page 17: ...elements Setting of temperature stage I reduced output to 50 90 C range optionally 50 115 C Setting of temperature stage II nominal output to 50 90 C range optionally 50 115 C in low temperature regi...

Page 18: ...e and filling with new water increases the danger of corrosion and scale development In case we have to refill the heating system with water we only refill a cold boiler in order to prevent the boiler...

Page 19: ...ose all small covers closing plate burner plate with burner mount the holder with explosive flap and check them for tightness 9 Instructions for product disposal after its service life Because the pro...

Page 20: ...by an authorized organization contractual service accredited by DB a s Bohum n Z vod topen sk techniky VIADRUS and the manufacturer of the burner being operated To document all records about carried o...

Page 21: ...19...

Page 22: ...11...

Page 23: ...ts of shell 26 exhaust neck 27 manostat valve 28 reservoirs 29 electric panel cover 30 upper rear part of sh 31 insulation of upper part of shell 32 frontal upper part of shell 33 upper part insulatio...

Reviews: