Boiler use and advantages 

 
 

A single-row cast-iron sectional hot-water boiler with an overpressure combustion chamber  and  a 

direct firing designed  for gas (

natural gas

) and fluid fuels ( 

furnace oil extra light

 ) central heating . The 

pressure burners used in combination with boiler must correspond to:  

Č

SN EN 676: 2000 – Gaseous fuels burners with  a ventilator and an automatic control  

Č

SN EN 267: 2000 – Fluid fuels burners wit  a  ventilator 

Č

SN EN 303-1:1999 – Boiler pro central heating  with  b ventilator 

Č

SN EN 303-2:1999 – Boiler pro central heating b ventilator 

Č

SN EN 303-3:1999 – Boiler pro central heating b ventilator 

 

 

 

The boiler is produced 

exclusively

 

for

 

low-pressure

 

hot-water 

 central heating systems with 

maximum 90 °C heating water operating temperature (optionally up to  115°C), minimum 60°C heating water 
operating temperature at maximum 4 bar operating overpressure . 

 

The boiler drum is tested by 8 bar testing overpressure.  
 
 
 
 

Boiler advantages are as follows: 

 

1.

 

Longstanding service life of cast-iron boiler drum  

2.

 

Highly economical operation. Combustion efficiency in the whole power series is higher than   91,5 % for all 

sorts of fuel  

3.

 

Optionally a  delivery incl. the burner  

4.

 

Modern design  

5.

 

Fully automatic two-stage operation 

6.

 

Boiler operation and defects signalling, possibly  use of signals for  transfer into a superior control system  

7.

 

Possibility to operate  boiler through the superior automatics or  a spatial temperature sensor  

8.

 

According to the boiler layout the closing plate can either open to the left-or the  right hand side   

9.

 

Easily accessible sight glass and the probe for overpressure measuring in combustion chamber.  

10.

 

In combination with recommended burners (see chapter “Boiler technical parameters”) this boiler is 

environmentally friendly because the whole power series combustion results meet the strict environmental 

standards and regulations.   

 

 

Summary of Contents for G 700

Page 1: ...1 MANUAL for boiler operation and installation VIADRUS G 700...

Page 2: ...k in low pressure boiler rooms Thereby a long time and trouble free boiler operation will be guaranteed to both your and our satisfaction VIADRUS G 700 boiler was approved to be operated in the Czech...

Page 3: ...ts setting 15 7 2 Electric panel 15 8 Maintenance 17 9 Instructions for product disposal after its service life 17 10 Guarantee and liability for defects 18 Purchase order Purchase order specification...

Page 4: ...ure at maximum 4 bar operating overpressure The boiler drum is tested by 8 bar testing overpressure Boiler advantages are as follows 1 Longstanding service life of cast iron boiler drum 2 Highly econo...

Page 5: ...bar 0 9 1 4 2 2 3 2 5 6 2 Recommended chimney draught mbar min 0 2 Boiler water volume l 252 277 302 327 352 377 Pressure loss on water side dt 20 K mbar 0 9 1 35 1 9 2 6 3 34 4 2 dt 10 K mbar 3 4 3 9...

Page 6: ...in combustion chamber The opening 126 mm in the upper part of the frontal section is closed by a flange with boring 3 x G 1 2 for the reservoir of thermostat safety thermostat and thermometer and the...

Page 7: ...7 Fig no 1 Boiler assembly...

Page 8: ...8...

Page 9: ...onsole of shell 23 connecting console 24 side part of shell frontal left 25 side part of shell frontal right 26 side part of shell 27 side part of shell rear 28 frontal part of shell segment 2 right 2...

Page 10: ...10 4 2 Electric wiring diagrams Fig no 2 Electric panel wiring diagram...

Page 11: ...nalling MPH1 burner stage 1 service hours meter MPH2 burner stage 2 service hours meter BT3 burner stage 2 thermostat X20 burner connector NOTE Water pressure manostat PS1 only in design for MORA firm...

Page 12: ...12...

Page 13: ...13 Fig no 3 Electric panel wiring diagram...

Page 14: ...ust be left a free handling space minimum up to the boiler depth 500 mm from one side 600 mm access to the back rear access 800mm and 500 mm between two boilers When installing the boiler we must cons...

Page 15: ...8 MPa b regarding the gas distribution SN EN 1775 1999 Gas supply Pipelines in buildings Maximum service overpressure less than 5 bar SN 38 6413 1990 Gas conduits and connections with low and medium...

Page 16: ...h and oak wood hobrex boards plywood werzalit umakart sirkolit C2 medium combustible Pinewood larch whitewood chipboard and cork boards rubber flooring C3 easily combustible Asphalt board fibreboards...

Page 17: ...elements Setting of temperature stage I reduced output to 50 90 C range optionally 50 115 C Setting of temperature stage II nominal output to 50 90 C range optionally 50 115 C in low temperature regi...

Page 18: ...e and filling with new water increases the danger of corrosion and scale development In case we have to refill the heating system with water we only refill a cold boiler in order to prevent the boiler...

Page 19: ...ose all small covers closing plate burner plate with burner mount the holder with explosive flap and check them for tightness 9 Instructions for product disposal after its service life Because the pro...

Page 20: ...by an authorized organization contractual service accredited by DB a s Bohum n Z vod topen sk techniky VIADRUS and the manufacturer of the burner being operated To document all records about carried o...

Page 21: ...19...

Page 22: ...11...

Page 23: ...ts of shell 26 exhaust neck 27 manostat valve 28 reservoirs 29 electric panel cover 30 upper rear part of sh 31 insulation of upper part of shell 32 frontal upper part of shell 33 upper part insulatio...

Reviews: