background image

 

 
 
Welded-on piece – pos. 3 

 
Welded-on piece – pos. 4 

 

 

 

 

 
Welded-on piece – pos. 5 

 
Welded-on piece – pos. 6 and 7  

 

 

 

 

 

 
Welded-on piece – pos. 8 

 
Welded-on piece – pos. 11 

 

 

 

 

 

 
 

Summary of Contents for AkuCOMFORT 1000 L

Page 1: ...Hercules U26 Návod k obsluze STORAGE TANKS OPERATING AND INSTALLATION MANUAL AkuCOMFORT 500 L AkuCOMFORT 750 L AkuCOMFORT 1000 L AkuCOMFORT 1500 L AkuCOMFORT 2000 L ...

Page 2: ...ts Page 1 Description of the tank 3 2 Assembly 3 3 Putting into operation 3 4 Operation a maintenance 3 5 Instructions for product disposal after its service life expiration 4 6 Conditions of guarantee 4 7 Transport 4 ...

Page 3: ...ture When deciding on the layout it is necessary to ensure the access to the valves and their servicing The tank must be in the vertical position Tanks are made of steel quality S235JRG2 Internal surface treatment no paint External surface treatment a primer Maximum working overpressure 0 3 MPa Maximum operating temperature 95 º C 100 mm foam insulation with a PVC foil normally the tank is deliver...

Page 4: ...ith paragraphs 2 3 and 4 of this manual the warranty period of 24 months from the date of putting Into Operation will apply to the storage tanks The manufacturer for the validity of his guarantee requires To inspect storage tanks regularly once a year Only an authorized service organization is qualified to exercise the inspections To document all records on carried out guarantee and after guarante...

Page 5: ...ickness 3 mm 3 Welded on piece G 6 4 4 Welded on piece G 5 4 5 Welded on piece G 5 4 6 Welded on piece G 1 7 Welded on piece G 1 8 Welded on piece G 1 2 9 Solar spiral steel Ø 28 x 3 2 10 heating spiral TV Cu 11 Tube kr Ø 22 x 1 91 12 Circular base ...

Page 6: ...6 Welded on piece pos 3 Welded on piece pos 4 Welded on piece pos 5 Welded on piece pos 6 and 7 Welded on piece pos 8 Welded on piece pos 11 ...

Page 7: ...of bottom incl base L6 mm 190 Height of connections for sensors or thermometers L5 mm 170 Height of boiler water connection L4 mm 75 Height of solar connection L3 mm 800 Height of boiler water connection L2 mm 1049 Height of the cylindrical part L1 mm 1490 Equipment height H mm 1905 Tank diameter without insulation d Ø 600 Diameter with insulation D Ø 800 Insulation made of hardened polyurethane f...

Page 8: ... of bottom incl base L6 mm 200 Height of connections for sensors or thermometers L5 mm 170 Height of boiler water connection L4 mm 75 Height of solar connection L3 mm 650 Height of boiler water connection L2 mm 850 Height of the cylindrical part L1 mm 1260 Equipment height H mm 1730 Tank diameter without insulation d Ø 790 Diameter with insulation D Ø 990 Insulation made of hardened polyurethane f...

Page 9: ... of bottom incl base L6 mm 200 Height of connections for sensors or thermometers L5 mm 170 Height of boiler water connection L4 mm 75 Height of solar connection L3 mm 850 Height of boiler water connection L2 mm 1050 Height of the cylindrical part L1 mm 1580 Equipment height H mm 2050 Tank diameter without insulation d Ø 790 Diameter with insulation D Ø 990 Isolation made of hardened polyurethane f...

Page 10: ...ht of bottom incl base L6 mm 330 Height of connections for sensors or thermometers L5 mm 200 Height of boiler water connection L4 mm 110 Height of solar connection L3 mm 900 Height of boiler water connection L2 mm 1150 Height of the cylindrical part L1 mm 1980 Equipment height H mm 2500 Tank diameter without insulation d Ø 1100 Diameter with insulation D Ø 1300 Isolation from hardened polyurethane...

Page 11: ...t of bottom incl base L6 mm 330 Height of connections for sensors or thermometers L5 mm 200 Height of boiler water connection L4 mm 110 Height of solar connection L3 mm 900 Height of boiler water connection L2 mm 1150 Height of the cylindrical part L1 mm 1750 Equipment height H mm 2475 Tank diameter without insulation d Ø 1300 Diameter with insulation D Ø 1500 Isolation from hardened polyurethane ...

Page 12: ...12 ...

Page 13: ...eration must be carried out according to Operating and installation manual for storage tanks by a contractual service organization accredited by the manufacturer The faults must be removed by a contractual service organization accredited by the manufacturer The completeness of the supplied storage tank is guaranteed by the seller The certificate of warranty is void if not filled out The user confi...

Page 14: ...arranty for the customer user Record of the carried out warranty and post warranty repairs and regular annual checks of the product Date of record Carried out activity Contractual service organization signature stamp Signature of customer ...

Page 15: ...utting Into operation must be carried out according to Operating and installation manual for storage tanks by a contractual service organization accredited by the manufacturer The faults must be removed by a contractual service organization accredited by the manufacturer The completeness of the supplied storage tank is guaranteed by the seller The certificate of warranty is void if not filled out ...

Page 16: ...16 ...

Page 17: ...nto operation must be carried out according to Operating and installation manual for storage tanks by a contractual service organization accredited by the manufacturer The faults must be removed by a contractual service organization accredited by the manufacturer The completeness of the supplied storage tank is guaranteed by the seller The certificate of warranty is void if not filled out The user...

Page 18: ...18 ...

Page 19: ...19 ...

Page 20: ...20 Date of updating 46 2012 GB ...

Reviews: