1. 

Description of the tank 

 

The storage tanks AkuCOMFORT serve for the accumulation of heat in the water volume. According to the 
required volume of the stored energy is necessary to select the appropriate size of storage tank. The tanks 
are used for following applications:  

 

equipments  with  heat  pumps  where  they    allow  an  economical  heat  pump  operation  independently  on 
the actual need for heat  

 

solar  equipments  where  the  an  excess  of  thermal  energy  obtained  from    sunlight  is  stored  and  is  
available at the time of a lack of sunshine  

 

solid fuel boilers where thanks to the storage tanks a continuous and efficient boiler operation is ensured 
during a slow combustion 

 

cogeneration units  where the waste heat produced in the process of  electricity  generation is stored and 
is ready for use  during the peaks in heat consumption  

 

heating and cooling systems for covering  and securing  the peaks in consumption 

 
Storage tanks AkuCOMFORT operate on the principle of storing in layers and they act as heat accumulators.  
Both  in  terms  of  time  and  hydraulics  the  storage  tank  can  separate  the  heat  production  and  consumption 
thanks to which the optimal adaptation of production and consumption is possible.  
Thus various possibilities and variants of connection are offered.  
Of course this principle of functioning can be transferred to the water cooling systems.  
The tank is equipped with a heat exchanger for heating the HWS. 
 

2. 

Assembly 

 

 

the tanks are placed on a flat floor or a steel structure. When deciding on the layout it is necessary to 
ensure the access to the valves and their servicing. The tank must be in the vertical position.  

 

Tanks are made of steel quality S235JRG2  

 

Internal surface treatment: no paint  

 

External surface treatment: a primer  

 

Maximum working overpressure: 0,3 MPa 

 

Maximum operating temperature: 95 º C  

 

100 mm foam insulation with a PVC foil (normally the tank is delivered with insulation already mounted). 

The connection of storage tanks must be carried out in accordance with project documentation elaborated by 
a specialized firm.  

!

 In case of a supplementary installation of the tank into the system it is important to verify the size of the 

expansion tank. 

 

3. 

Putting into operation 

 

After the assembly completion the leakage test is carried out. All joints connecting the storage tank with the 
heating system are checked for tightness. Then the whole system is rinsed and filled with heating medium. 
The  heating  medium  must  be  secured  against  the  corrosive  effects  by  adding  the  corrosion  inhibitor.  The 
manufacturer recommends inhibitor CORTEC Vp Cl - 649 BD. The inner tank volume is not designed for hot 
water storage and its heating. After this activity the tank is ready for operation. 

 

4. 

Operation a maintenance  

 
The operation of the tank does not require any special activities on the part of the user.  
It  is  recommended  to  check  the  integrity  of  the  insulation  and  carry  out  the  leakage  test  of  all  connections 
once every year. Possible leaks must be removed in order to prevent the loss of water in the heating system 
and the tank shell is protected against an unnecessary burden caused by corrosion.  
The inhibitor has to be refilled every 12 months.   
 

Summary of Contents for AkuCOMFORT 1000 L

Page 1: ...Hercules U26 Návod k obsluze STORAGE TANKS OPERATING AND INSTALLATION MANUAL AkuCOMFORT 500 L AkuCOMFORT 750 L AkuCOMFORT 1000 L AkuCOMFORT 1500 L AkuCOMFORT 2000 L ...

Page 2: ...ts Page 1 Description of the tank 3 2 Assembly 3 3 Putting into operation 3 4 Operation a maintenance 3 5 Instructions for product disposal after its service life expiration 4 6 Conditions of guarantee 4 7 Transport 4 ...

Page 3: ...ture When deciding on the layout it is necessary to ensure the access to the valves and their servicing The tank must be in the vertical position Tanks are made of steel quality S235JRG2 Internal surface treatment no paint External surface treatment a primer Maximum working overpressure 0 3 MPa Maximum operating temperature 95 º C 100 mm foam insulation with a PVC foil normally the tank is deliver...

Page 4: ...ith paragraphs 2 3 and 4 of this manual the warranty period of 24 months from the date of putting Into Operation will apply to the storage tanks The manufacturer for the validity of his guarantee requires To inspect storage tanks regularly once a year Only an authorized service organization is qualified to exercise the inspections To document all records on carried out guarantee and after guarante...

Page 5: ...ickness 3 mm 3 Welded on piece G 6 4 4 Welded on piece G 5 4 5 Welded on piece G 5 4 6 Welded on piece G 1 7 Welded on piece G 1 8 Welded on piece G 1 2 9 Solar spiral steel Ø 28 x 3 2 10 heating spiral TV Cu 11 Tube kr Ø 22 x 1 91 12 Circular base ...

Page 6: ...6 Welded on piece pos 3 Welded on piece pos 4 Welded on piece pos 5 Welded on piece pos 6 and 7 Welded on piece pos 8 Welded on piece pos 11 ...

Page 7: ...of bottom incl base L6 mm 190 Height of connections for sensors or thermometers L5 mm 170 Height of boiler water connection L4 mm 75 Height of solar connection L3 mm 800 Height of boiler water connection L2 mm 1049 Height of the cylindrical part L1 mm 1490 Equipment height H mm 1905 Tank diameter without insulation d Ø 600 Diameter with insulation D Ø 800 Insulation made of hardened polyurethane f...

Page 8: ... of bottom incl base L6 mm 200 Height of connections for sensors or thermometers L5 mm 170 Height of boiler water connection L4 mm 75 Height of solar connection L3 mm 650 Height of boiler water connection L2 mm 850 Height of the cylindrical part L1 mm 1260 Equipment height H mm 1730 Tank diameter without insulation d Ø 790 Diameter with insulation D Ø 990 Insulation made of hardened polyurethane f...

Page 9: ... of bottom incl base L6 mm 200 Height of connections for sensors or thermometers L5 mm 170 Height of boiler water connection L4 mm 75 Height of solar connection L3 mm 850 Height of boiler water connection L2 mm 1050 Height of the cylindrical part L1 mm 1580 Equipment height H mm 2050 Tank diameter without insulation d Ø 790 Diameter with insulation D Ø 990 Isolation made of hardened polyurethane f...

Page 10: ...ht of bottom incl base L6 mm 330 Height of connections for sensors or thermometers L5 mm 200 Height of boiler water connection L4 mm 110 Height of solar connection L3 mm 900 Height of boiler water connection L2 mm 1150 Height of the cylindrical part L1 mm 1980 Equipment height H mm 2500 Tank diameter without insulation d Ø 1100 Diameter with insulation D Ø 1300 Isolation from hardened polyurethane...

Page 11: ...t of bottom incl base L6 mm 330 Height of connections for sensors or thermometers L5 mm 200 Height of boiler water connection L4 mm 110 Height of solar connection L3 mm 900 Height of boiler water connection L2 mm 1150 Height of the cylindrical part L1 mm 1750 Equipment height H mm 2475 Tank diameter without insulation d Ø 1300 Diameter with insulation D Ø 1500 Isolation from hardened polyurethane ...

Page 12: ...12 ...

Page 13: ...eration must be carried out according to Operating and installation manual for storage tanks by a contractual service organization accredited by the manufacturer The faults must be removed by a contractual service organization accredited by the manufacturer The completeness of the supplied storage tank is guaranteed by the seller The certificate of warranty is void if not filled out The user confi...

Page 14: ...arranty for the customer user Record of the carried out warranty and post warranty repairs and regular annual checks of the product Date of record Carried out activity Contractual service organization signature stamp Signature of customer ...

Page 15: ...utting Into operation must be carried out according to Operating and installation manual for storage tanks by a contractual service organization accredited by the manufacturer The faults must be removed by a contractual service organization accredited by the manufacturer The completeness of the supplied storage tank is guaranteed by the seller The certificate of warranty is void if not filled out ...

Page 16: ...16 ...

Page 17: ...nto operation must be carried out according to Operating and installation manual for storage tanks by a contractual service organization accredited by the manufacturer The faults must be removed by a contractual service organization accredited by the manufacturer The completeness of the supplied storage tank is guaranteed by the seller The certificate of warranty is void if not filled out The user...

Page 18: ...18 ...

Page 19: ...19 ...

Page 20: ...20 Date of updating 46 2012 GB ...

Reviews: