Viadrus AkuCOMBI 1000/200 L Operating And Installation Manual Download Page 11

 

11

 
Technical parameters 

Designation 

AkuCOMBI 1000/200 L 

Spirals  

 

solar 

CH 

The volume of external tank  

800 

The volume of HWS tank 

200 

Maximal allowable temperature  

o

100 

Maximal allowable pressure in the tank  with heating 
water  

bar 

Maximal allowable pressure in the HWS tank 

bar 

Surface of heat exchanger  

m

2

 

2.4 

Volume of heat exchanger 

15.8 

5,8 

Dimensions 
Height of heating water connection  

GS1 

mm 

350 

Height of solar connection (return)  

GS2 

mm 

420 

Height sensor connection (solar)  

GS3 

mm 

720 

Height solar connection (supply)  

GS4 

mm 

825 

Height of CH connection (return)  

GS5 

mm 

925 

Height of sensor connection (CH)  

GS6 

mm 

1075 

Height of CH connection (inlet)  

GS7 

mm 

1225 

Height of other source connection (return)  

GS8 

mm 

430 

Height of other source connection (inlet)  

GS9 

mm 

830 

Height of other source connection (return)  

GS10 

mm 

1120 

Height of other source connection (inlet)  

GS11 

mm 

1520 

Height of equipment  

mm 

2000 

Tank diameter (without insulation)  

Ø 

mm 

900 

Diameter with insulation  

Ø 

mm 

1100 

Insulation made of  hardened polyurethane 
foam 

 

mm 

100 

External shell  

skay  

Hydraulic connections 

Heating water connection 

internal  

thread 

1” 

Solar circuit (supply / return branch)  

internal  

thread 

1” 

CH circuit (supply / return)  

internal  

thread 

5/4“ 

Solar circuit (supply / return)  

internal  

thread 

1” 

E-coupling (heating element)  

internal  

thread 

1 1/2” 

Sensor Connection  

internal  

thread 

3/4" 

Cover of sensor  

internal  

thread 

1/2" 

Cold water / hot water  

external 

thread 

3/4" 

Circulation  

external 

thread 

3/4" 

Magnesium Anode  

plug 

5/4” 

Weight (empty) 

kg 

485 

 

Summary of Contents for AkuCOMBI 1000/200 L

Page 1: ...Hercules U26 Návod k obsluze STORAGE TANKS OPERATING AND INSTALLATION MANUAL AkuCOMBI 500 160 L AkuCOMBI 600 200 L AkuCOMBI 800 200 L AkuCOMBI 1000 200 L ...

Page 2: ...age 1 Description of construction 3 2 Installation of the storage tank 3 3 Type defects their causes and remedies 3 4 IMPORTANT NOTICES 4 5 Instructions for product disposal after its service life expiration 5 6 Guarantee 5 ...

Page 3: ... maintenance with pressure not exceeding 0 6 MPa but the minimal pressure must not be lower than 0 1 MPa approx l atm In the event that water pressure in the water main exceeds 0 6 MPa it must be reduced using a reduction valve n the cold water inlet pipe there must be installed a safety valve The drain valve of the safety valve always must be left open and be in contact with the atmosphere It is ...

Page 4: ...s it is necessary to keep proof of purchase anode Regular replacement is a condition of the tank warranty validity this regards the enamelled tank 10 To prolong the service life of the tank and ensure proper functioning of the safety valve is necessary to use filters for catching impurities 11 If the tanks are operated in a very aggressive environment e g cowshed it is necessary to purchase a prod...

Page 5: ...Guarantee Guarantee of an enamel storage tank is 36 months The other parts 24 months The guarantee includes the above period but the maximum the period of warranty plus 12 months from the date of manufacture The manufacturer for the validity of his guarantee requires To inspect storage tanks regularly once a year Only an authorized service organization is qualified to exercise the inspections To d...

Page 6: ...6 AkuCOMBI 500 160 L AkuCOMBI 600 200 L AkuCOMBI 800 200 L AkuCOMBI 1000 200 L GS1 GS2 GS3 GS4 GS5 GS6 GS7 0 GS8 GS9 GS10 L GS11 Air release valve G 1 2 ...

Page 7: ...T G 1 2 CIRCULATION G 3 4 10 COLD WATER INLET G 3 4 10 REVERSE OF SPIRAL G 3 4 10 SENSOR PROTECTION R 1 2 12 HWS OUTLET G 3 4 10 VENT G 1 2 SUPPLY G 3 4 CIRCULATION G 3 4 HWS G 3 4 REVERSE G 3 4 COLD WATER G 3 4 MAGNESIUM ANODE SENSOR PROTECTION ...

Page 8: ...inlet GS7 mm 1360 Height of other source connection return GS8 mm 360 Height of other source connection inlet GS9 mm 710 Height of other source connection return GS10 mm 1010 Height of other source connection inlet GS11 mm 1360 Height of equipment L mm 1730 Tank diameter without insulation Ø mm 700 Diameter with insulation Ø mm 900 Insulation made of hardened polyurethane foam mm 100 External shel...

Page 9: ...ion CH GS6 mm 1335 Height of CH connection inlet GS7 mm 1560 Height of other source connection return GS8 mm 360 Height of other source connection inlet GS9 mm 760 Height of other source connection return GS10 mm 1160 Height of other source connection inlet GS11 mm 1560 Height of equipment L mm 1920 Tank diameter without insulation Ø mm 700 Diameter with insulation Ø mm 900 Insulation made of hard...

Page 10: ...inlet GS7 mm 1220 Height of other source connection return GS8 mm 430 Height of other source connection inlet GS9 mm 750 Height of other source connection return GS10 mm 1000 Height of other source connection inlet GS11 mm 1320 Height of equipment L mm 2000 Tank diameter without insulation Ø mm 900 Diameter with insulation Ø mm 1100 Insulation made of hardened polyurethane foam mm 100 External she...

Page 11: ...nlet GS7 mm 1225 Height of other source connection return GS8 mm 430 Height of other source connection inlet GS9 mm 830 Height of other source connection return GS10 mm 1120 Height of other source connection inlet GS11 mm 1520 Height of equipment L mm 2000 Tank diameter without insulation Ø mm 900 Diameter with insulation Ø mm 1100 Insulation made of hardened polyurethane foam mm 100 External shel...

Page 12: ...12 ...

Page 13: ...n must be carried out according to Operating and installation manual for storage tanks by a contractual service organization accredited by the manufacturer The faults must be removed by a contractual service organization accredited by the manufacturer The completeness of the supplied storage tank is guaranteed by the seller The certificate of warranty is void if not filled out The user confirms th...

Page 14: ...arranty for the customer user Record of the carried out warranty and post warranty repairs and regular annual checks of the product Date of record Carried out activity Contractual service organization signature stamp Signature of customer ...

Page 15: ... Into operation must be carried out according to Operating and installation manual for storage tanks by a contractual service organization accredited by the manufacturer The faults must be removed by a contractual service organization accredited by the manufacturer The completeness of the supplied storage tank is guaranteed by the seller The certificate of warranty is void if not filled out The us...

Page 16: ...16 ...

Page 17: ...eration must be carried out according to Operating and installation manual for storage tanks by a contractual service organization accredited by the manufacturer The faults must be removed by a contractual service organization accredited by the manufacturer The completeness of the supplied storage tank is guaranteed by the seller The certificate of warranty is void if not filled out The user confi...

Page 18: ...18 ...

Page 19: ...19 ...

Page 20: ...20 Date of revision 46 2012 GB ...

Reviews: