
8
9
www.vexve.com
www.vexve.com
Prior to installation:
· Remove the flow port protectors
· Clean the pipes and the valve, see Figure 8
· Close the valve fully before welding or installing it in the pipeline.
The valve must remain closed for the entire installation procedure!
WARNING:
Pipeline and valve shall be carefully cleaned prior to installation as any welding debris or
other impurities can damage the valve.
Valve installation:
· Check the instructions for the correct location of valve in the pipeline, see chapter 4.1
· Install the valve in an allowed position, see chapter 4.2
· See chapter 4.5 for installation instructions of valve with welding ends
· See chapter 4.6 for installation instructions of valve with flanges
NOTE:
The valve must be used only in applications for which it is intended.
Figure 8. Clean the pipes and the valve before installation.