The final step to fully assembling the
Playing Field
is to attach the combined
Goal
and
Hanging Bar
structure onto
the assembled
Playing FIeld
. The 1x1 Snap Pins on the bottoms of the goals will align to specific clusters on the
floor tiles. The next page has more detailed close-up top views of the field showing the exact locations of the correct
four-hole clusters to snap the goals into.