5.3.10 Installation of power supply
Starter motors: the cables
that run from the battery to
the starter motors must have
a cross-section of at least
50 mm
2
(AWG 0)(both the
plus and the minus cable).
Electrical installation: the
earth poles of the batteries
must be connected with a
cable with a cross-section
of at least 50 mm
2
. (AWG 0)
The earth line from the con-
trol box must come directly
from the batteries.
Control box: each control
box must be powered by the
batteries. The power cables
(plus) must be fitted with a
10 A decoupling diode.
In this way the control
box is always powered by
the battery which is high-
est charged. The minimum
cross-section for the cable is
2.5 mm
2
(AWG 12).
‘R1’ is a relay that is acti-
vated by the key of the port
engine, while ‘R2’ is a relay
that is activated by the key of
the starboard engine.
5.3.11 Power supply
The system works on 12 V battery power supply. The table gives the breaking current for the fuses used to
protect the electronic cards in the control box.
Voltage
12 V
Internal fuse (on card)
3.15 A
Fuse in panel
6.15 A
No load current t
0.5 A
C
O
M
M
AN
D
EN
G
IN
E
2
W
AR
M
/S
EN
G
IN
E
1
Battery
Battery
Portside engine
Starboard engine
Control lever
Actuator
From Portside
key switch
From Starboard
key switch
Summary of Contents for VF4.140E
Page 1: ...Installation manual VF4 VF5 VF4 140E VF4 170E VF4 190E VF5 220E VF5 250E ...
Page 2: ...vetus Installation manual VF4 VF5 400202 01 Copyright 2012 Vetus n v Schiedam Holland ...
Page 22: ...20 400202 01 vetus Installation manual VF4 VF5 ...
Page 68: ...66 400202 01 vetus Installation manual VF4 VF5 ...
Page 71: ...400202 01 69 vetus Installation manual VF4 VF5 ...
Page 72: ...340401 01 12 07 Nederlands Printed in the Netherlands Vetus Diesel VF4 VF5 Nederlands ...