NOTE:
Numbers
in
parentheses
refer
to
item
numbers
in
the
table
on
p1.
STEP
1
Attach
Weldment
(11)
Align
axle
holes
in
weldment
with
axle
channel
(refer
to
exploded
diagram
on
front
page)
in
the
base
of
the
trash
bin
Insert
axle
through
weldment
holes
and
axle
channel
11
14
STEP
2
Attach
wheels
to
ends
of
the
axle
Press
wheels
onto
the
ends
of
the
axle
until
they
latch
onto
the
axle.
(Pins
inside
the
axle
receiver
of
each
wheel
hold
onto
grooves
milled
into
the
axle.)
STEP
3:
Attach
foot
lever
(10)
to
axle
bracket
weldment
Fasten
foot
pedal
shims
(7)
to
the
weldment
using
nuts
(8)
&
bolts
(9)
as
shown
in
the
diagram
to
the
right.
Do
not
tighten
theses
connections
yet.
Insert
foot
lever
(10)
around
trash
bin,
then
insert
the
ends
of
the
pedal
under
the
shims
&
between
the
bolts.
14
10
7
9
8
STEP
4:
Connect
lid
lifting
weldment
(6)
to
axle
bracket
weldment
Insert
end
“A”
through
hole
“B”
in
the
center
of
the
bracket
weldment
Secure
the
connection
with
a
cotter
pin
(5)
through
the
end
of
the
lifting
weldment
A
B
5
STEP
5:
Connect
lid
lifter
bracket
(1)
Connect
lid
lifter
bracket
(1)
to
lid
lifting
bar
(6)
with
¼
bolt
(4)
&
hex
nut
(2)
STEP
6:
Attach
lid
Place
lid
over
top
of
bracket
(1).
Align
handle
brackets
with
handle
&
insert
the
handle
plugs
(13).
1
6
4
2
13
Axle
receiv
er
6