SLNM
, Manual
Copyright 201
5
Vestil Manufacturing Corp.
Page 4 of
1
4
Connect the sling to
both
hook points on the
Mast
(1 on each side; the picture below only shows the hook point
on the right side); then lift the unit no more than 6 – 8 inches above the pallet. The
SLNM
will tilt towards the
rear
end
. Additionally, it may swing from side-to-side once free of the pallet if you did not properly position the hoist
above the center of the sling. Stabilize the suspended
stacker
with one hand, and stand safely to the side while
operating the hoist.
To remove the
SLNM
from the shipping pallet using a hoist:
Hook Point