Rev. 8/2/2018
MEZZ-200, MANUAL
Copyright 2018 Vestil Manufacturing Co. Page 8 of 11
Select a location for the mezzanine gate system that is close to the edge of the upper level. Assemble the gate
following the instructions on pages 8 and 9. Move the gate assembly into position and anchor it to the surface by
installing
3
/
8
” anchor bolts through the 4 bolt holes in each post mounting bracket. The length of the anchor bolts
should be determined by your building engineer.
Top gate
Bottom
gate
Side
gate
Upper level
Installation diagram:
39
7
/
16
in.
Lower level
Post mounting bracket
3
/
8
”
anchor
bolt