Rev. 2/10/2020
CB-S-2S MANUAL
Copyright 2020 Vestil Manufacturing Corp. Page 3 of 5
EXPLODED VIEW AND BILL OF MATERIALS
ITEM NO. PART NO.
DESCRIPTION
QTY
1
16-014-320
BOTTOM DECK PLATE
1
2
16-014-321
LEFT SIDE PANEL FRAME
1
3
16-014-322
RIGHT SIDE PANEL FRAME
1
4
16-017-063
BAR STIFFENER
2
5
11103
HEX BOLT, GRADE A, ZINC PLATED, 3/8 X 16X3/4
11
6
36106
HEX NUT, GRADE A, ZINC PLATED, 3/8-16
11
7
16-001-216
CYLINDER MOUNT BRACKET ASSEMBLY
1
ANCHORING THE RACK
Before loading the rack with cylinders,
attach it to a wall with 3/8” anchoring
hardware.
USING THE RACK
Load the rack with, at most, 2 cylinders.
Rest the cylinders against the cylinder
cradles. Secure cylinders to the rack with
the straps.
Anchor
rack to
wall with
3/8”
hardware
Cylinder
cradle