Installation Instructions
The delivered supporting frame must always be mounted!
The following suitable covering frames of the brand Jung “TopLine”,
alpine white are available:
Combination frame one-fold,
Article-No. 01400101
Combination frame two-fold,
Article-No. 01400102
Combination frame three-fold,
Article-No. 01400103
Combination frame four-fold,
Article-No. 01400104
Combination frame five-fold,
Article-No. 01400105
For flush-type mounting
please use our flush-type box,
Article-No. 01030750
For control via two drives, we recommend our isolating relays:
Isolating relays TR2,
Article-No. 010540
Isolating relays TR2A,
Article-No. 010541.
- 20 -
G
Notes for Professional Electricians
Installation and putting into operation:
1. Carefully pull to remove the cover cap of the roller shutter control
Vestamatic
DZ-Plus “R”
.
2. Loosen the screws and separate the supporting frame from hous-
ing.
3. Mount the supporting frame.
There are several holes available for different switch boxes as well
as for the wall mounting.
A special flush-type box is available for the wall mounting.
4. Perform the wiring according to the wiring diagram.
Attention: Currently valid VDE standards must be observed,
when connecting the device, in particular DIN VDE
0100/0700 as well as the currently valid regulations
of your local power company and accident preven-
tion regulations.
5. Push the basic housing carefully into the supporting frame (make
sure not to pinch any cables) and tightly fasten the screws.
Note: Parallel triggering of several drives can only be implemented
with isolating relays or cluster controllers.
- 19 -
G
83200211 F1.qxd 25.09.01 15:55 Seite 19