
WG
H
-
E
/ G
H
-
E
Model:
1
8
- 24
,QVWDOODWLRQDQG0DLQWHQDQFH
6HUYLFH0DQXDO
3
to remove the cover.
4
Remove every wiring terminals, and remove the
electric box cover sub-assy.
1
Remove the screws fixing connection pipe
clamp, to remove the connection pipe clamp.
7.Remove evaporator sub-assy
electric box cover sub-assy
screw
electric box cover
screw
auxiliary piping
pipe clamp
screw
Steps
Procedure
Summary of Contents for GH18E
Page 4: ... 7HFKQLFDO QIRUPDWLRQ WGH E GH E Model 18 24 6HUYLFH 0DQXDO GH 24 E 2XWGRRU 8QLW GH 18 E ...
Page 73: ...WGH E GH E Model 18 24 QVWDOODWLRQ DQG 0DLQWHQDQFH 6HUYLFH 0DQXDO 8QLW ...
Page 81: ...WGH E GH E Model 18 24 QVWDOODWLRQ DQG 0DLQWHQDQFH 6HUYLFH 0DQXDO GH 24 E ...
Page 83: ...WGH E GH E Model 18 24 QVWDOODWLRQ DQG 0DLQWHQDQFH 6HUYLFH 0DQXDO GH 24 E ...
Page 115: ...Vidicon Ltd Commercial Air Conditioners R410A Systems ...