Verve VOSC Installation Manual Download Page 2

Occupancy Sensor – Ceiling Mounted • Installation Guide 

page 2 of 4

Verve™ Living Systems

Coverage Diagrams

Tip: 

To provide coverage for very high ceilings, a wall sensor can 

be incorporating in the plan for complete coverage.

 Installing

estimated time: 20 minutes 

The occupancy sensor can be mounted on most ceilings with the 
provided screws, or mounted on dropped ceilings, using the 
provided wire bracket.

1.

Decide where you want to install the occupancy sensor. 

Tip: 

For visual alignment, orient the sensor parallel to one of 

the walls.

2.

Remove the mounting plate from the sensor.

3.

Decide which of the two installation options is appropriate

.

Screw Mounting Plate to the Ceiling

a. Hold the mounting plate in place on the ceiling and use a 

pencil to lightly mark two small dots for the

 

screw drill 

points. 

b. Drill two holes with a 3/16” drill bit and insert the wall 

anchors.

c. Insert the first screw 

loosely and level the 
mounting plate. 

d. Insert the second screw 

and then hand-tighten the 
first screw. 

Mount Using the Wire Bracket

a. Remove the ceiling tile where you want to mount the 

sensor.

b. Place the mounting plate squarely on the ceiling tile and 

use the wire to mark two points for the holes. 

c. Punch two small holes through the ceiling tile at the 

marked points.

d. Insert the wire bracket 

through the two holes in 
the mounting plate. 

Make sure the ends are 
roughly even.

e. Feed the wires through the 

holes in the ceiling tile. 

f. On the front of the ceiling 

tile, flatten the wire bracket 
so it is snug against the 
mounting plate. 

g. On the back of the ceiling 

tile, twist the wires 
together to hold the 
mounting plate securely.

h. Replace the ceiling tile.

4.5m

3m

1.5m

5’

10’

15’

Top View

Side View

1’

3.1’ 4.6’

7.5’

9.3’ 10.9’

13.0’ 14.2’

16.8’

0

10’

0

0-1’

3.1’ 4.6’

7.5’ 9.3’

16.8’

14.2’

13.’

10.9’

10’

0

Reviews: